My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 7/9/2019
>
Contracts
>
Capital Contract
>
American Process Group Inc 7/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:38:00 AM
Creation date
7/11/2019 9:36:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
7/9/2019
Council Approval Date
6/5/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2019 Biosolids Removal Project
Public Works WO Number
UT3705 2
Tracking Number
0001872
Total Compensation
$611,408.12
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 2600 - 2 <br /> 2019 Biosolids Removal UT3705-2 <br /> B. When requested, the Contractor shall provide pricing per 1.01 C of this section for review <br /> and approval by the Owner, prior to proceeding with the work. <br /> 1.4 CHANGE ORDERS <br /> A. A change order to the work will be issued including one or more Request for Change I <br /> Proposals. The cumulative amount of adds and deducts along with the change in the <br /> number of days approved in each individual RFCP shall be added to or deducted from <br /> the Contract. The change order shall incorporate the RFCP forms, and all required back <br /> up documentation into a lump sum contract adjustment. <br /> B. The payment for work performed under the change order cannot be made until the <br /> change order has been signed and approved as per 007200-6. <br /> C. If an individual change order exceeds 10% of the original contract amount and is over <br /> $50,000, a special review may be required by the Owner. <br /> PART 2 - PRODUCTS (Not Used) 1 <br /> PART 3 - EXECUTION (Not Used) ' <br /> END OF SECTION 01 2600 <br /> 1 <br /> I <br /> 1 <br /> I <br /> 1 <br /> I <br /> 01 2600 - 2 CONTRACT MODIFICATION PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.