Laserfiche WebLink
City of Everett 01 2973 - 4 <br /> 2019 Biosolids Removal UT3705-2 <br /> A. Assign following, making sum equal to total cost for each line item activity to show <br /> initial costs of work activity and total installed cost. <br /> 1. Labor. , <br /> 2. Equipment. <br /> 3. Material. <br /> 4. Subcontractor. <br /> 5. Overhead and Profit. <br /> 6. Total Cost. <br /> B. Show total sum for each cost category as well as total cost for each work activity. <br /> PART 2 - PRODUCTS (Not Used) <br /> PART 3 - EXECUTION (Not Used) ' <br /> END OF SECTION 01 2973 <br /> 1 <br /> I <br /> 1 <br /> I <br /> i <br /> i <br /> I <br /> 01 2973 - 4 SCHEDULE OF VALUES <br />