Laserfiche WebLink
City of Everett 01 5700 - 4 <br /> 2019 Biosolids Removal UT3705-2 <br /> E. The Contractor shall control dust throughout the project. <br /> F. No burning, including trash or vegetation, will be permitted. <br /> G. Refer to Regulation III Puget Sound Clean Air Agency Article 4, Asbestos Control <br /> Standard, in the event the Contractor damages an existing duct, asbestos cement pipe, <br /> or any other facility that may contain asbestos. Repairs, Removal and containment shall <br /> be completed per WAC 296-62-07701 through 296-62-07753 as covered by chapter <br /> 49.17 RCW, Washington Industrial Safety and Health Act, RCW chapter 49.26. <br /> 1.8 DUST CONTROL <br /> A. Use water sprinkling, temporary enclosures, and other methods to limit dust and dirt I <br /> migration. Do not apply water in quantities that would result in the creation of mud. <br /> Comply with all local regulations. <br /> B. The Contractor shall not discharge smoke, dust, and other contaminants into the <br /> atmosphere that violate the regulations of any legally constituted authority. The <br /> Contractor shall abide by all applicable regulations enforced by the Puget Sound Clean <br /> Air Agency. <br /> C. The Contractor shall minimize dust nuisance by cleaning, sweeping, vacuum sweeping, I <br /> sprinkling with water or other means. The use of water, in amounts which result in mud <br /> on public streets, is not acceptable as a substitute for sweeping or other methods. <br /> Equipment for this operation shall be on the job site or available at all times as <br /> appropriate. <br /> D. In the case of concrete work, the Contractor shall provide worker training and protection, <br /> as required, to meet applicable silica regulations and regulatory guidance regarding silica <br /> exposure. <br /> 1.9 NOISE CONTROL <br /> A. The Contractor shall take all reasonable measures for the suppression of noise resulting I <br /> from Work operations. Mobile engine driven cranes, loaders and similar material <br /> handling Equipment; engines used in stationary service for standby power; air <br /> compressors for high and low pressure service; and other similar Equipment shall be <br /> equipped with exhaust and air intake silencers designed for the maximum degree of <br /> silencing. The type of silencer required is that for use in critical noise problem locations <br /> such as high density residential, hotel, and hospital areas. I <br /> B. The Contractor shall conduct performance of the Work consistent with the applicable . <br /> noise control levels set forth in the City of Everett Ordinance# 1556-89. <br /> 111 <br /> 1.10 LIABILITY AND PAYMENT <br /> I <br /> 01 5700 - 4 TEMPORARY CONTROLS <br /> I <br />