My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 7/9/2019
>
Contracts
>
Capital Contract
>
American Process Group Inc 7/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:38:00 AM
Creation date
7/11/2019 9:36:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
7/9/2019
Council Approval Date
6/5/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2019 Biosolids Removal Project
Public Works WO Number
UT3705 2
Tracking Number
0001872
Total Compensation
$611,408.12
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 7423 - 1 <br /> 2019 Biosolids Removal UT3705-2 <br /> SECTION 01 7423 - FINAL CLEANING <br /> PART 1 - GENERAL <br /> 1.1 SUMMARY <br /> A. This section includes administrative and procedural requirements for final cleaning of the <br /> Work prior to Substantial Completion, including but not limited to: <br /> 1. Cleaning procedures <br /> 2. Inspection <br /> B. Do not use cleaning materials that may damage paved surfaces. <br /> C. Do not use cleaning materials hazardous to health or property. <br /> PART 2 - PRODUCTS (not used) <br /> PART 3 - EXECUTION <br /> 3.1 FINAL CLEANING <br /> A. Clean project site (yard and grounds) of litter and foreign substances. Sweep or hose <br /> paved areas to a broom-clean condition free of dust. Remove stains, petro-chemical <br /> spills and other foreign deposits. Rake grounds which are neither planted nor paved to <br /> a smooth, even-textured surface. <br /> B. Except as otherwise indicated or requested by the City, remove temporary protection <br /> devices and facilities installed to protect previously completed work during the remainder <br /> of the construction period. <br /> I <br /> 3.2 INSPECTION <br /> A. Prior to requesting inspection for certification of Substantial Completion, inspect exposed <br /> surfaces. Verify entire Work area is clean. <br /> B. Prior to certifying Substantial Completion, the City will make a detailed inspection of site <br /> and will prepare a check list of cleaning and debris removal remaining to be completed <br /> before certification of Substantial Completion. Complete items on the City's check list, <br /> ' so that entire Project is clean and ready for occupancy by staff and public. <br /> END OF SECTION 01 7423 <br /> I <br /> 01 7423 - 1 FINAL CLEANING <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.