My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 7/9/2019
>
Contracts
>
Capital Contract
>
American Process Group Inc 7/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:38:00 AM
Creation date
7/11/2019 9:36:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
7/9/2019
Council Approval Date
6/5/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2019 Biosolids Removal Project
Public Works WO Number
UT3705 2
Tracking Number
0001872
Total Compensation
$611,408.12
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 4336- 1 <br /> 2019 Biosolids Removal UT3705-2 <br /> SECTION 00 4336- PROPOSED SUBCONTRACTORS FORM <br /> I <br /> 1. For heating, ventilation, air conditioning, plumbing (as defined by RCW Chap. 18.106) and <br /> I electrical work (as defined by RCW Chap. 19.28), Bidder MUST either identify itself or <br /> Subcontractors in the chart below. If Bidder believes such work is not part of the Work, <br /> Bidder shall write "NO WORK". <br /> I 2. Bidder shall not list more than one Subcontractor for each category of Work identified, <br /> unless Subcontractors vary with Bid alternates, in which case the Bidder must indicate <br /> which Subcontractor will be used for which alternate. <br /> 3. Bidder's Bid shall be deemed non-responsive and void if: <br /> A. For heating, ventilation,air conditioning, plumbing and electrical work, Bidder fails: <br /> (1) to submit as part of the Bid the names of such Subcontractors; (2) to name <br /> Iitself to perform such Work; or(3)to write"No Work"; or <br /> B. Bidder names two or more Subcontractors to perform the same Work. <br /> I 4. The requirement to name the Bidder's proposed heating, ventilation and air conditioning, <br /> plumbing, and electrical subcontractors applies only to proposed heating, ventilation and <br /> air conditioning, plumbing, and electrical subcontractors who will contract directly with the <br /> general contractor submitting the Bid to the City. <br /> I <br /> 41 if :::4,36-'''' a ,.. i 'a "c ite ,S7��t;''.irO ":tom,,. y- I`" y' <br /> , , , P g T/ Scopf i or }Name ant a resa omuocoti cfor coir fader <br /> . .s �.t& .x....X:,. - A3.c� ;_.. v�, :+ k i &.. 're a''e,7 x'..•t3j,k 1 ;a,e J +rk gY 71:0 14. );44ii <br /> HEATING <br /> I Subcontractor, bidder or"no work" MUST be <br /> stated No Work <br /> VENTILATION AND AIR CONDITIONING <br /> I Subcontractor, bidder or"no work"MUST be <br /> stated No Work <br /> PLUMBING (as described in RCW Chap. 18.106) <br /> Subcontractor, bidder or"no work" MUST be <br /> I stated No Work <br /> ELECTRICAL (as described in RCW Chap. 19.28) <br /> Subcontractor, bidder or"no work"MUST be stated Preferred Electric PO Box 77120 Seattle, WA 98177 <br /> I <br /> IEND OF SECTION 00 4336 <br /> I <br /> I <br /> I <br /> I00 4336- 1 PROPOSED SUBCONTRACTORS FORM <br /> l vided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.