My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 7/9/2019
>
Contracts
>
Capital Contract
>
American Process Group Inc 7/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:38:00 AM
Creation date
7/11/2019 9:36:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
7/9/2019
Council Approval Date
6/5/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2019 Biosolids Removal Project
Public Works WO Number
UT3705 2
Tracking Number
0001872
Total Compensation
$611,408.12
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 6365 - 2 <br /> 2019 Biosolids Removal UT3705-2 <br /> I <br /> As allowed by the contract, the City directs the Contractor as follows: <br /> 1. The Scope of Work shall be changed to the extent described in Exhibit A. I <br /> 2. The contract price shall be adjusted as described in this Change Order. <br /> 3. The duration of the Contract, and contractually scheduled completion date, shall be adjusted to <br /> the extent described in this Change Order. <br /> 4. Unless the Contractor timely and properly follows the procedures in the contract for seeking <br /> further equitable adjustment of time and compensation, including, but not limited to, delays. <br /> impacts, inefficiencies, overhead, and direct and indirect costs, and except as otherwise <br /> expressly provided herein, the Contractor will be barred from (a) asserting any claim for further <br /> adjustment of time and compensation arising out of, or relating to, the charges described in this <br /> Change Order or Work described in Exhibit A and (b) asserting an equitable adjustment of time <br /> or price arising earlier than the date of this Change order. This provision does not apply to <br /> requests for equitable adjustment of time or price for which the Contractor timely and properly <br /> provided notice of a differing site condition, protest, dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for notice of a <br /> differing site condition, protest, dispute, claim, or Contract Claim that ends after the date of this <br /> Change Order, but relates to work performed prior to the date of this Change order, then this <br /> provision does not apply if the Contractor timely and properly submits such notice. <br /> 5. This Change Order only changes the contract between Contractor and City to the extent <br /> explicitly provided herein. <br /> Attest: Approved As to Form: <br /> 1 <br /> Mayor City Clerk City Attorney <br /> Date: Date: Date: <br /> Recommended By: <br /> Construction Project Manager (if Engineering Manager Department Director ' <br /> Manager (if applicable) (if applicable) <br /> applicable) <br /> Date: <br /> Date: Date: Date: <br /> 00 6365 - 2 CHANGE ORDER - UNILATERAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.