My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 7/9/2019
>
Contracts
>
Capital Contract
>
American Process Group Inc 7/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:38:00 AM
Creation date
7/11/2019 9:36:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
7/9/2019
Council Approval Date
6/5/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2019 Biosolids Removal Project
Public Works WO Number
UT3705 2
Tracking Number
0001872
Total Compensation
$611,408.12
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 12 1 <br /> 2019 Biosolids Removal UT3705-2 <br /> 5. If bidding on a public works project subject to the apprenticeship utilization requirements in <br /> RCW 39.04.320, not have been found out of compliance by the Washington state apprenticeship <br /> and training council for working apprentices out of ratio,without appropriate supervision, or <br /> outside their approved work processes as outlined in their standards of apprenticeship under <br /> chapter 49.04 RCW for the one-year period immediately preceding the date of the bid <br /> solicitation; and I <br /> 6. Within the three-year period immediately preceding the date of the bid solicitation, not have been <br /> determined by a final and binding citation and notice of assessment issued by the department of <br /> labor and industries or through a civil judgment entered by a court of limited or general <br /> jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of chapter <br /> 49.46, 49.48, or 49.52 RCW. <br /> The Contract Documents shall apply to Subcontractors and Suppliers as if each had signed the Contract <br /> with the Owner. Contractor shall include the provisions of these Contract Documents or a"flow down" <br /> clause in each contract with Subcontractors and Suppliers. <br /> 4.4. RESPONSIBILITIES <br /> 4.4.1. Subcontractors,Manufacturers and Suppliers <br /> The Contractor shall be responsible for the adequacy, efficiency and sufficiency of Subcontractors, <br /> manufacturers, Suppliers and their employees. <br /> 4.4.2. Contractor's Employees ' <br /> The Contractor shall be responsible for the adequacy,efficiency and sufficiency of its employees. <br /> Workers shall have sufficient knowledge, skill and experience to perform properly the Work assigned to <br /> them. <br /> 4.4.3. Payment for Labor and Materials <br /> The Contractor shall pay and require its Subcontractors to pay any and all accounts for labor including <br /> Worker's Compensation premiums, State Unemployment and Federal Social Security payments and other <br /> wage and salary deductions required by law. The Contractor also shall pay and cause its Subcontractors <br /> to pay any and all accounts for services,Equipment, and materials used by him and its Subcontractors <br /> during the performance of Work under this Contract. The Contractor shall pay such accounts as they <br /> become due and payable. If requested by the Owner,the Contractor shall promptly furnish proof of <br /> payment of such accounts to the Owner. <br /> 4.4.4. Attention to Work <br /> The Contractor,acting through its representative, shall give personal attention to and shall manage the <br /> Work so that it shall be prosecuted faithfully and completed under the Project schedule. When its <br /> representative is not personally present at the Project Site, its designated alternate shall be available and <br /> shall have the authority to act in matters relating to this Contract. <br /> 4.4.5. Safety I <br /> The Contractor alone shall be responsible for safety on the job Site, including, but not limited to,the <br /> safety of its and its Subcontractor's employees. The Contractor shall maintain the Project Site and <br /> perform the Work in a manner which meets the Owner's responsibility under statutory and common law <br /> for the provision of a safe place to work. <br /> 4.4.6. Threats,Intimidation and Harassment Forbidden <br /> Contractor shall not allow its employees, its Subcontractors, its Subcontractors' employees, or any other <br /> agents to threaten bodily injury or property damage,to intimidate or attempt to intimidate any person, or <br /> to assault or physically harass any person. Forbidden conduct includes,but is not limited to,threatening, <br /> appearing, or actually doing any of the following: pushing, shoving, striking,physically blocking a person <br /> 00 7200 - 12 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.