My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 7/9/2019
>
Contracts
>
Capital Contract
>
American Process Group Inc 7/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:38:00 AM
Creation date
7/11/2019 9:36:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
7/9/2019
Council Approval Date
6/5/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2019 Biosolids Removal Project
Public Works WO Number
UT3705 2
Tracking Number
0001872
Total Compensation
$611,408.12
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 2113 - 6 <br /> 2019 Biosolids Removal UT3705-2 <br /> B. Pre Award Conference <br /> 1. After Bid opening, but prior to award, the apparent successful Bidder shall, if <br /> requested by the City, attend a pre-award conference to respond to questions by <br /> the City regarding evaluation of Bids. The City will emphasize items such as <br /> insurance and bonding that will assist in prompt issuance of the Notice to proceed. <br /> By conducting a pre-award conference, the City has not thereby waived its right to <br /> make determinations regarding responsiveness and responsibility of the Bidder. <br /> C. Acceptance of Bid <br /> 1. Within 60 days after the opening of Bids, the City will act either to accept the Bid <br /> from the lowest responsive, responsible Bidder, or to reject all Bids. The City <br /> reserves the right to request extensions of such Bid acceptance period. The <br /> acceptance of a Bid will be evidenced by a written Notice of Award of Contract I <br /> delivered in person or by certified mail to the Bidder whose Bid is accepted, <br /> together with a request to furnish a performance and payment bond and evidence <br /> of insurance and to execute the Contract set forth in the Contract Documents. <br /> 2. Bidder has 14 calendar days after receiving the Notice of Award to submit the <br /> following documents to the City: <br /> a. Two (2) executed copies of the Contract. <br /> b. Contract bond or equivalent performance and payment bond per SECTION <br /> 007200, Part 15.2 "Bonds", of the Contract Documents. <br /> c. Certificate of Insurance and additional insured endorsement, SECTION <br /> 007200, Part 15.3 "Insurance", of the Contract Documents. <br /> 3. A Contract shall not be formed until the Contract Documents are signed by the <br /> Mayor. <br /> i <br /> 1.14 TIME OF COMPLETION <br /> A. The Contractor shall complete the Work on or before the date or dates specified in I <br /> Section 005213 - CONTRACT. <br /> 1.15 WAGES <br /> A. All laborers, workmen, or mechanics in each trade or occupation employed in the <br /> performance of the Contract either by Contractor, Subcontractor, or other person doing <br /> Work shall be paid not less than the prevailing rate of wage as defined in RCW <br /> 39.12.010. Current prevailing wage rates may be found on line at111 <br /> http://www.lni.wa.gov/TradesLicensing/PrevWage/WageRates/. The rules and <br /> regulations noted within the Contract Documents are available from: <br /> State of Washington Department of Labor and Industries <br /> Prevailing Wage Section <br /> PO Box 44540 <br /> Olympia, WA 98504-4540 <br /> (3l_JV) 902'5 33.J <br /> pw1@lni.wa.gov <br /> B. Bidders are advised to examine and to be thoroughly familiar with such requirements. I <br /> No claim for additional compensation will be allowed that is based upon a lack of <br /> I <br /> 00 2113 - 6 INSTRUCTIONS TO BIDDERS <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.