My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORCA 6/13/2019
>
Contracts
>
Agreement
>
Interlocal Agreements
>
ORCA 6/13/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:12 AM
Creation date
7/11/2019 9:46:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
ORCA
Approval Date
6/13/2019
Council Approval Date
5/22/2019
Department
Transportation Services
Department Project Manager
Bob Hunter
Subject / Project Title
Implementation Operation of ORCA System
Tracking Number
0001873
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.3 Networks, Equipment and Software. <br /> 7.3.1 Comply with preventative maintenance programs as outlined in the SI or other ORCA <br /> Vendor contracts and in operations and maintenance manuals provided by the <br /> contractor. <br /> 7.3.2 Monitor the Agency's networks, equipment, and software related to the ORCA System <br /> and take such reporting and corrective measures as are required under the business <br /> rules and policies adopted by the Joint Board. <br /> 7.3.3 Provide to the ORCA Director requested information relating to, and take requested <br /> actions required for, the administration and enforcement of warranties on all ORCA- <br /> related equipment, hardware and software. <br /> 7.3.4 Maintain equipment and equipment inventory, warranty and repair records and provide <br /> reports as requested by the ORCA Vendors or the ORCA Director to monitor overall <br /> system and component reliability, identify regional trends in equipment failures. <br /> 7.3.5 Comply with the processes and requirements set out by the ORCA Vendors and the <br /> ORCA Director to submit requests for authorizing return of equipment and return of <br /> defective equipment. <br /> 7.3.6 Comply with the process set out by the ORCA Director for the submission of <br /> documentation to receive ORCA Vendor reimbursement, if applicable, for the cost of <br /> removing, replacing and returning defective equipment. <br /> 7.3.7 Maintain an inventory of spare ORCA System equipment adequate to have sufficient <br /> quantities available for the Agency's ORCA operations at all times. <br /> 7.4 System Operations. <br /> 7.4.1 As applicable, provide and maintain communication lines, wireless communications <br /> infrastructure, routers and switches connecting locations, including, but not limited to <br /> Agency facilities, as necessary for data transmittal for the ORCA System. <br /> 7.4.2 Repair and reinstate communications networks to maintain an adequate level of network <br /> availability as needed to support operation of the ORCA System, as set forth in the Service <br /> Level Agreement with the ROOT and as adopted by the Joint Board. <br /> 7.4.3 Train, or provide training for Agency personnel on operation and maintenance of the <br /> ORCA System, consistent in content with those of other Agencies and based on training <br /> materials developed by ORCA Vendors. <br /> 7.4.4 Allow ORCA Vendors to access Agency equipment and facilities for the performance of <br /> development, installation, operation and maintenance functions under applicable <br /> contracts; provided that the ORCA Vendor shall comply with the Agency's security <br /> policies, procedures and requirements including applicable labor agreements. <br /> 7.4.5 Submit requests to modify the ORCA System following the change management process <br /> as set forth in Service Level Agreement with the ROOT and as adopted by the Joint Board. <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.