Laserfiche WebLink
• State of Washington Department of Ecology Page 23 of 38 <br /> Agreement No: WQC-2019-EverPW-00052 <br /> Project Title: Port Gardner Bay Outfalls Water Quality Treatment Retrofit <br /> Recipient Name: City of Everett Public Works Department <br /> seq.) The RECIPIENT shall ensure that all iron and steel products used in the project are produced in the United <br /> States. Iron and Steel products means the following products made primarily of iron or steel: lined or unlined pipes <br /> and fittings,manhole covers and other municipal castings,hydrants,tanks,flanges,pipe clamps and restraints,valves, <br /> structural steel,reinforced precast concrete,and construction materials. The RECIPIENT may request waiver from <br /> this requirement from the Administrator of the Environmental Protection Agency. The RECIPIENT must coordinate <br /> all waiver requests through ECOLOGY. This provision does not apply if the engineering plans and specifications for <br /> the project were approved by ECOLOGY prior to January 17,2014. ECOLOGY reserves the right to request <br /> documentation of RECIPIENT'S compliance with this provision. <br /> C.Authority of RECIPIENT: This agreement is authorized by the Constitution and laws of the state of Washington, <br /> including the RECIPIENT's authority,and by the RECIPIENT pursuant to the authorizing ordinance or resolution. <br /> The RECIPIENT shall submit a copy of the authorizing ordinance or resolution to the ECOLOGY Financial Manager <br /> before this agreement shall be signed by ECOLOGY. <br /> D. Equivalency Projects: (For designated equivalency projects only) <br /> 1. The RECIPIENT must procure architectural and engineering services in accordance with the federal requirements in <br /> Chapter 11 of Title 40,U.S.C. (see <br /> www.gpo.gov/fdsys/pkg/USCODE-2011-title40/pdf/USCODE-2011-title40-subtitlel-chap l l.pdf). <br /> E. Fiscal Sustainability Plan Certification: The RECIPIENT shall submit a completed Fiscal Sustainability Plan <br /> Certification before this agreement is signed by ECOLOGY. The Fiscal Sustainability Plan Certification is available <br /> from the ECOLOGY Financial Manager or on the Water Quality Program website. <br /> F. Funding Recognition and Outreach: In addition to Section 2.F of these Terms and Conditions,the <br /> RECIPIENT agrees to comply with the EPA SRF Signage Guidance in order to enhance public awareness of EPA <br /> assistance agreements nationwide. The signage guidance can be found at: <br /> http://www.ecy.wa.gov/programs/wq/funding/FundPrgms/CWSRF/SignageGuidanceJune2015.pdf. <br /> G.Insurance:The RECIPIENT shall at all times carry fire and extended insurance coverage,public liability,and <br /> property damage,and such other forms of insurance with responsible insurers and policies payable to the RECIPIENT <br /> on such of the buildings, equipment,works,plants,facilities,and properties of the Utility as are ordinarily carried by <br /> municipal or privately-owned utilities engaged in the operation of like systems,and against such claims for damages <br /> as are ordinarily carried by municipal or privately-owned utilities engaged in the operation of like systems,or it shall <br /> self-insure or participate in an insurance pool or pools with reserves adequate,in the reasonable judgment of the <br /> RECIPIENT,to protect it against loss. <br /> H.Litigation Authority:No litigation is now pending,or to the RECIPIENT's knowledge,threatened, seeking to <br /> restrain,or enjoin: <br /> (i) the execution of this agreement;or <br /> (ii) the fixing or collection of the revenues,rates,and charges or the formation of the ULID and the levy and <br /> collection of ULID Assessments therein pledged to pay the principal of and interest on the loan(for revenue secured <br /> lien obligations);or <br /> (iii) the levy and collection of the taxes pledged to pay the principal of and interest on the loan(for general <br /> obligation-secured loans and general obligation payable from special-assessment-secured loans);or <br /> (iv) in any manner questioning the proceedings and authority under which the agreement,the loan,or the project are <br /> authorized. Neither the corporate existence,or boundaries of the RECIPIENT nor the title of its present officers to <br /> their respective offices is being contested. No authority or proceeding for the execution of this agreement has been <br /> repealed,revoked,or rescinded. <br /> I.Loan Interest Rate and Terms: This loan agreement shall remain in effect until the date of final repayment of the <br /> loan,unless terminated earlier according to the provisions herein. <br /> When the Project Completion Date has occurred,ECOLOGY and the RECIPIENT shall execute an amendment to this <br /> loan agreement which details the final loan amount(Final Loan Amount),and ECOLOGY shall prepare a final loan <br /> repayment schedule. The Final Loan Amount shall be the combined total of actual disbursements made on the loan <br /> Version 10/30/2015 <br />