Laserfiche WebLink
f �1 <br /> DEPARTMENT OF <br /> v ECOLOGY <br /> irf <br /> State of Washington C <br /> Agreement No. WQC-2019-EverPW-00051 <br /> WATER QUALITY COMBINED FINANCIAL ASSISTANCE 2019 AGREEMENT <br /> BETWEEN <br /> THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY <br /> AND <br /> CITY OF EVERETT PUBLIC WORKS DEPARTMENT <br /> This is a binding Agreement entered into by and between the state of Washington,Department of Ecology,hereinafter <br /> referred to as"ECOLOGY,"and City of Everett Public Works Department,hereinafter referred to as the"RECIPIENT,"to <br /> carry out with the provided funds activities described herein. <br /> GENERAL INFORMATION <br /> Project Title: Reduction of CSOs at Two Snohomish River <br /> Outfalls <br /> Total Cost: $1,673,550.00 <br /> Total Eligible Cost: $1,673,550.00 <br /> Ecology Share: $1,317,050.00 <br /> Recipient Share: $356,500.00 <br /> The Effective Date of this Agreement is: 07/01/2018 <br /> The Expiration Date of this Agreement is no later than: 06/30/2022 <br /> Project Type: Stormwater Facility <br /> Project Short Description: <br /> This project will improve water quality in the Snohomish River through design and construction of stormwater best <br /> management practices(BMPs)in Combined Sewer Overflow(CSO)basins SR07 and SR08,in the City of Everett. <br /> This project will reduce total suspended solids(TSS)and peak flows to the Snohomish River through stormwater <br /> separation,stormwater treatment,and flow control.Additional benefits may include aquatic habitat improvement. <br /> Project Long Description: <br /> The RECIPIENT will identify,evaluate,and design stormwater facilities in the Combined Sewer Overflow(CSO) <br /> SR07 and SR08 basins in the City of Everett.The SR07 and SR08 drainage catchment area includes major roadways <br /> and residential use areas,with the total basin area consisting of approximately 1,000 acres.This project will identify <br /> priority areas of this catchment to route stormwater to flow control, separate storm systems,and stormwater treatment <br /> facilities that may include green stormwater infrastructure(GSI)and infiltration. The RECIPIENT will construct <br />