Laserfiche WebLink
CIE% <br /> 1505 <br /> CCROVVN <br /> ASTLE Seat Westlake Ave N Phone: (206) 336-3204 <br /> Seattle,WA 98109 Fax: <br /> 14.00 <br /> wwwcrowncastle.com <br /> October 31,2018 <br /> City of Everett <br /> Permit Services <br /> 320o Cedar St. <br /> Everett,WA 98201 <br /> RE: Eligible Facilities Request to modify equipment on a communications tower located at: <br /> 6107 Berkshire Dr.,Everett,WA,98203 <br /> Crown Site Number:823967/Crown Site Name:Everett Monopole <br /> Customer Site Number:SEo16o3A/Application Number:427333 <br /> Crown Castle USA Inc.("Crown Castle")on behalf of T-Mobile West LLC("T-Mobile")is submitting the attached <br /> Eligible Facilities Request application to modify transmission equipment on a telecommunications tower located at 6107 <br /> Berkshire Dr.,Everett,WA 98203 in CITY OF EVERETT,WA(the"Everett Monopole Tower"). <br /> Section 6409 of the Middle Class Tax Relief and Job Creation Act of 2012,commonly known as the"Spectrum Act" <br /> (Pub.Law No.112-96,126 Stat 156),mandates that state and local governments"may not deny,and shall approve,any <br /> eligible facilities request for a modification of an existing wireless tower or base station that does not substantially <br /> change the physical dimensions of such tower or base station." Additionally,if"the reviewing State or local government <br /> determines that the application is incomplete"[they]"must provide written notice to the applicant within 3o days of <br /> receipt of the application,clearly and specifically delineating all missing documents or information." Under federal law, <br /> an Eligible Facilities Request is deemed granted with written notification in sixty(6o)days after an application is filed <br /> with a local jurisdiction,excluding tolling. <br /> T-Mobile proposes to modify the"Everett Monopole Tower"as follows: <br /> Structurally reinforce monopole shaft;remove(i)platform mount,(3)antennas,(g)RRU's,(6)diplexers; <br /> and install(i)platform mount,(3)antennas,and(6)RRU's on existing tower.T-Mobile also proposes to <br /> replace(i)cabinet,remove(4)modules,and install(8)modules within cabinets within existing compound. <br /> Itemized list of submittal documents: <br /> • (1)Cover Letter <br /> • (1)Building Permit Application <br /> • (3)Structtural Analysis stamped by Washington State engineer <br /> • (3)Construction Drawings stamped by Washington State engineer—11"x17"print <br /> • (i)Check for$532.19 <br /> T-Mobile is committed to working cooperatively with all jurisdictions around the country to secure expeditious approval <br /> of requests to modify existing personal wireless service facilities. If you should require more information regarding the <br /> Spectrum Act,please do not hesitate to contact me with your questions. <br /> The Foundation for a Wireless World, <br /> CrownCastle.com <br />