My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2501 BROADWAY 2019-07-31
>
Address Records
>
BROADWAY
>
2501
>
2501 BROADWAY 2019-07-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2019 9:13:24 AM
Creation date
7/12/2019 9:27:19 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
2501
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLICINORKS PERMIT Date Applied: 11/29/2018 <br /> 01.11P/441 City of Everett Permit Services Public Works Permit#: PW1811-058 <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: <br /> Everett,WA 98201 Planning Reference#: <br /> (425) 257-8810 Public Works Fee: $65 <br /> 04 DEC 201d <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> GENNE BOLES/CABLE INVESTMENT Co. Inc. ERIC ZUERN//ENVIRONMENTAL ASS., Inc. <br /> P.O.BX 1589 1380 112th AVE. N.E. <br /> TELLURIDE, CO, 81435 BELLEVUE, WA, 98004 <br /> PHONE: 9707080391 PHONE: 4254559025 <br /> TAX PARCEL ID#: 00439156700100 SITE ADDRESS: 2501 BROADWAY '? <br /> DESCRIPTION: ONE (1) ENVIRONMETAL BORING <br /> (11/29/2018 2:58 PM BES) <br /> ONE (1) ENVIRONMETAL BORING ON SIDEWALK OF THE ADDRESSED BUILDING <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Traffic Control must be done in accordance with MUTCD Standards and the Traffic Control Plan approved (as noted) by <br /> City of Everett dated 11/30/2018. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction, to <br /> evaluate traffic control set-up, with other inspection requests, and to final the permit. <br /> 6. Any damage to City improvements (sidewalk, curb, roadway, etc.) shall be replaced per City Standards and/or as <br /> directed by the City PW Inspector. <br /> 7. All existing underground utilities must be located and protected throughout the duration of project if any cuts are <br /> anticipated. <br /> 8. It is the owner/applicant's responsibility to ensure the safety of pedestrians and workers is maintained and any damage to <br /> surrounding structures, vehicles, etc. associated with the scope of this permit is the sole responsibility of the 1. 7,1 <br /> owner/applicant. The City makes no claim to the reliability of the scaffolding structure being erected."--• � a <br /> Public Works Permit Fee Breakdown: , .;r? .r n' <br /> c cc:<- i zi <br /> Misc. Minor Permits $25.00 , <br /> PW Plan Review $20.00 co m <br /> PW Site Inspection $20.00 `;) <br /> E <br /> Cri <br /> met u .r s. <br /> r.2 r7 •. <br /> •. <br /> �-� City of EverettOfcial Use Only ACKNOWLEDGEMENT OF CONDMONS,--4 <br /> / The undersigned owner/applicant hereby agrees to hold AncliAive <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> f 'J expenses,or causes of action that may arise because of installation and <br /> Q maintenance of the improvement or other right-of-way use here to applied <br /> pproved for Constructs•• 'ubliC orks) to for and further agrees to remove same upon notice from the City and to <br /> replace public .roperty dam-ged thereby. <br /> FINAL INSPECTION Date 12 "Ht <br /> Approved as Constructed (PW Inspector) Sig,. ure of Ai)", cant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.