My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2602 BROADWAY JIMMY JOHNS 2019-12-19
>
Address Records
>
BROADWAY
>
2602
>
JIMMY JOHNS
>
2602 BROADWAY JIMMY JOHNS 2019-12-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 11:43:41 AM
Creation date
7/12/2019 9:29:00 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
2602
Tenant Name
JIMMY JOHNS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLId'UVORKS PERMIT Date Applied: 12/13/2018 <br /> City of Everett Permit Services Public Works Permit#: PW1812-032 <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> lilt" <br /> �- <br /> 401111V-A <br /> Everett,WA 98201 Planning Reference#: <br /> (425)257-8810 Public Works Fee: $65.00 <br /> 1 3 DEC 2018 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> SHAW BROADWAY LLC SHAW BROADWAY LLC <br /> 1020 148TH AVE NE 1020 148TH AVE NE <br /> BELLEVUE, WA, 98007 BELLEVUE, WA, 98007 <br /> PHONE: PHONE: <br /> TAX PARCEL ID#: 00439160802702 SITE ADDRESS: 2602 BROADWAY <br /> DESCRIPTION: REPLACING A PORTION OF PARKING LOT <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 12/13/2018. <br /> Approved plans must remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction for ,", <br /> consultation and to evaluate Erosion/Sedimentation control set-up. All inspections must be formally requsted`-" ee••t ki <br /> attached handout for phone number and online instructions to Request an Inspection. '=1 d <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved SVP 'AiI . Remove upon <br /> completion of the project prior to final approval of the permit. X., "`"'"' <br /> cric7 i.0 <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. ;-; <br /> 8. Protect all existing underground utilities during construction. E-::.1 :;'7.-; <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfacesMiU'-be <br /> managed on-site in a manner that does not adversely affect neighboring properties, including the City's right-of-way ar4or <br /> easements and the improvements located therein. z <br /> 10. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Ca71%the inspection lina;to <br /> >,0 . <br /> request a Final for this permit when all items have been completed. �, t <br /> 11. All work constructed within the public right-of-way must be removed or relocated at the owner s0iise if the City_@ver <br /> requires use of the right-of-way for municipal purposes. 8 0 84; �,c:, <br /> C:)P :..7in <br /> 12. Parking lot striping to follow City of Everett Standard 340 for stall dimensions. — <br /> Public Works Permit Fee Breakdown: <br /> Paving (1,999SF) $45.00 <br /> PW Site Inspection $20.00 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> ' 12.113 <br /> a 3 / (2) maintenance <br /> or causes of action that may arise because of installation and <br /> maintenance of the improvement or other right-of-way use here to applied <br /> pproved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> FINAL INSPECTION Date <br /> 0 1%S. A a�0.5 v-c7,._ 12— 1.3 — 20" l‘ <br /> 41 <br /> Approved as Constructed (PW Inspector) Signature of Arplicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br /> Fr —' <br />
The URL can be used to link to this page
Your browser does not support the video tag.