Laserfiche WebLink
a. <br /> ENGINEERING <br /> 7 PUBLIC SERVICES DEPARTMENT <br /> November 1, 2017 <br /> David Flake <br /> David.a.flake@gmail.com <br /> 10704 64th PL W <br /> Mukilteo, WA 98275 <br /> RE: Owner: David Flake <br /> Job Address: 2211 W Casino Road <br /> Plan Check Number: B1710-030 <br /> Dear Mr. Flake, <br /> In response to your application for a construction permit, your plans have been examined and you <br /> are advised that revisions may be necessary before a permit can be issued. Please review and <br /> respond to the comments below. These comments address building issues only. Additional <br /> revisions or additions may be required by other departments (such as Public Works, Planning, or <br /> Fire). All references refer to the 2015 International Building Code (IBC), as amended by the State <br /> of Washington and adopted by the City of Everett. The current IBC referenced standard for <br /> accessible design is the 2009 "Accessible and Usable Buildings and Facilities" (ICC/ANSI A117.1). <br /> Federal ADA regulations and standards may be more restrictive. All required submittals must be of <br /> sufficient detail and information to ensure that the proposed structure will be constructed in <br /> compliance with all adopted codes. <br /> In order for the processing of your application to continue, it will be necessary to <br /> provide the Building Division with two complete new sets of construction documents <br /> reflecting the corrections requested. All revisions require the person delivering the <br /> drawings to replace the revisions into the two sets here at our offices. For significant <br /> revisions, or if the revisions are coming directly from a document printing facility, <br /> please make arrangements with them to print and deliver two replacement sets. <br /> Structural <br /> 1. It appears that the report provided with the permit calculations does not list the R-factor of <br /> 6.5 (per Table 12.2-1 of ASCE 7-10) as determined by the engineer of record in the <br /> calculation package. An R-factor of 6.5 utilizes a lateral system of wood structural panels <br /> of which none appear to be provided in construction of the walls. Rather the wall <br /> construction appears to be gypsum wall panels which would appear to require an R-factor <br /> of 2 (per Table 12.2-1). Please clarify and revised the R-factor as required and supporting <br /> calculations. <br /> Page 1of2 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8810 • Fax(425) 257-88 <br />