Laserfiche WebLink
6/27/2019 Page 1 <br /> City of Everett <br /> 11:57:31AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B 1710-045 Site Address 2211 W CASINO RD <br /> Applied 10/24/2017 Applicant Lot <br /> Approved 1/23/2018 Owner FLAKE DAVID&MARCIA Block <br /> Issued 1/23/2018 Contractor OWNER Tract <br /> Parent Permit No. Description SECOND FLOOR ADDITION,NEW LAB AREA <br /> Notes **UPDATE/NEW SPRINKLERS AND UPDATE/NEW DETECTION REQUIRED** <br /> Scheduled Completed 1Wne Inspector Result Remarks Inspector's Comments <br /> 1/24/2018 1/24/2018 BLDG 13-OTHER DWF CORRECTION See notes Footings-Need structural engineer letter for <br /> soils compaction and rebar placement. <br /> Note:Not elevator pit anf attaching <br /> trenches. <br /> 2/13/2018 2/13/2018 BLDG DWF APPROVAL Footings for elevator pit as per plans <br /> 02-FOOTING/SETB OK for concrete <br /> 2/21/2018 2/21/2018 BLDG KMK PARTIAL APPR Elevator shaft walls. <br /> 03-FOUNDATION OK to pour <br /> 2/23/2018 2/23/2018 BLDG DWF OTHER CANCEL Not ready <br /> 08-FRAMING <br /> 2/27/2018 2/27/2018 BLDG DWF PARTIAL APPR Office area 1&2 floor existing area only. <br /> 08-FRAMING OK to cover. <br /> 3/16/2018 3/16/2018 BLDG DWF PARTIAL APPR Room#210 and 212 OK to cover <br /> 08-FRAMING <br /> 3/28/2018 3/28/2018 BLDG DWF PARTIAL APPR 1st floor-production room#188 only OK <br /> 08-FRAMING to cover. <br /> 4/18/2018 4/18/2018 BLDG DWF PARTIAL APPR Elevator wall&10A <br /> 10-INTERIOR room only <br /> 4/25/2018 4/25/2018 BLDG DWF APPROVAL Subject to elect& <br /> 08-FRAMING mech before cover <br /> 5/24/2018 5/24/2018 BLDG DWF APPROVAL OK to cover subject <br /> 08-FRAMING to electrical rough <br /> 6/18/2018 6/18/2018 BLDG 12-CEILING DWF APPROVAL <br /> GRID <br /> 10/9/2018 10/9/2018 BLDG 14-FINAL DWF CORRECTION Not Ready:Need electrical finals, <br /> E1802-161,E1804-028,S1805-003 before <br /> building inspection final. <br /> 4/26/2019 4/26/2019 BLDG 15-FINAL DWF CORRECTION Need to install guardrailing on mez level- <br /> storage area. <br /> Received Engineering letter for approved <br /> installation-ok. <br /> Required exit-Install demarcation lines in <br /> shop from stair way to exit door. <br /> Verify tempered glass in office area. <br /> 5/6/2019 5/6/2019 BLDG 15-FINAL DWF APPROVAL <br /> 5/6/2019 5/6/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> 6/25/2019 6/25/2019 CERTIFICATE OF TRL APPROVAL <br /> OCCUPANCY <br /> 6/25/2019 6/25/2019 FIRE 02-FINAL SAG APPROVAL SEE NOTES (6/25/2019 11:20 AM CRB) <br /> SEE PERMITS E1803-122 AND <br /> K1801-003 <br /> INSP12 <br />