Laserfiche WebLink
INSPECTION REPORT <br /> ,' :---444-vc;I:':, 4 �1too <br /> ,,0 <br /> Date: J )g Permit: lL� I- 61 <br /> Contractor: <br /> Owner: <br /> Site Address: 00 W• 1. Di I �- I 1 <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑ Medical Gas <br /> • eiling Grid ❑Drywall Nailing ❑ Plumbing Final <br /> K. Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> 1XZAPPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS P R , <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED rm <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> El UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> ariAMMIMAILMA‘L _ __— 0 k <br /> 41()Inspector: . Date: „mmHg 6 <br /> EIR(4/09) >_/7N/j7C-aRa ORMS&PROMOTIONS•425/488-8900 <br />