Laserfiche WebLink
'111glimigi` REV. # BY. DATE: PER: SHEETS: 27' X 56' MOBILE CLASSROOM SNA RAsy �C,Eo PROF <br /> �� LH 5/10/06 - `�T'�oQWAs/F7h0<i 5' LWLINEFQ S,rL() <br /> MEE=min Ec]�q i�N 13 Lai I <br /> MODERN BUILDING SYSTEMS. INC. EA TON VI LLE <br /> J z <br /> x r ct <br /> TELEPHONE: (503)719-1919 FAX: (503)719-1950 OREGON P.O = <br /> .BOX 110•9193 PORTER ROAD•AUMSNLLE,OR 97325 <br /> CHECK OUT OUR WEB PAGE: WWW.mbs-mod,IIar.Uon pa,tR��11 7�� sfA qse 4, 4-- <br /> CHECK <br /> OF DOCUMENTS <br /> EATONVILLE, WASHINGTON QP�w'UNALG 2,)fIHA RAS��,'y ~ <br /> L <br /> TMs BMT Aro M CEASAK0 DC9015 WNLNP0.TPI J <br /> MO <br /> R M PC PLArtUSIA WOO W&PM sFOR A NG FOUNDATION DETAILS I I DIMES 11/)1/10 S <br /> .NO IS NOT TO BE USIA W MOLE I W PMT.FOR ANY EXPIRES: 7/2/10 (n <br /> anm Y4 03 PIgfCT WTrgN!wand.unONZ.M,. <br /> STRAP TENSIONING INSTRUCTIONS: FRAME TIE WITH HOOK <br /> 4.) ONCE TENSIONED TO THE <br /> (// PONT THAT COUNTER- eA <br /> NCE <br /> 1 / /��/ I�� APPEARS.A 5/B?AOPEN- T.)ATTACH FRAME HOOK TO TOP. 1� <br /> ,' I IIr/�/AA �pr�1� END WRENCH SHARD BE INBOARD LOCATION OF I-BEAM. \ <br /> 1 G I I` /1(/ USED TO MOLD THE SQUARE (FRAME HOOK MUST BE ATTACHED <br /> V ` NECK W1aLE RESPOSIlION- TO FRAME AT POINTS CLOSETS TO <br /> 1 ING THE 1NOL'LZ FLOOR SUPPORTS.) 1111. <br /> 11 <br /> II INC WRENCH WHICHWILL <br /> ENABLE CONTINUED AND <br /> FINAL TENSIONING. REPEAT <br /> 1.) 2.) 3.) AS REWIRED <br /> INSERT THE TENSION BOLT WTO THE PLACE 7HE STRAP END THROUGH THE BEND THE STRAP AT 90 DECREES 2.)KEEPING IN UNE WITH THE HOOK, \, .J <br /> ANCHOR HEAD AND LOOSELY ATTACH SLOTTED SHANK OF THE TENSION AND WITH THE USE OF 15/16' WRAP GALVAM7ED STRAP COM- <br /> THE HEA NUT BOLT AND BRING FLUSHLY TO THE OP- SOCKET OR OPEN-END WRENCH, FIFTEEN'AROUND 1-BEAM. <br /> POSITS SIDE OF THE SHANK. ROTATE IN A CLOCKWISE MANNER I <br /> WRAPPING THE STRAP AROUND THE A <br /> SHANK OF THE TENSION BOLT. <br /> 5.)ONCE FULLY TENSIONED. F——_, <br /> ALIGN THE SOUARE NECK OF <br /> WARNING- CAREFULLY INSPECT EACH ANCHORING LOCATION FOR HAZARDOUS UNDERGROUND WIRING.CONSULT ) <br /> THE BOLT WITH THE SQUARE 3 •ANCHOR MUST BE SECURELY <br /> LOCAL UTILITY COMPANIES OR BUILDING AUTHORITIESNECESSARY.AS IS NECESSARY. ;H_I <br /> RECESS IN THE ANCHOR INSTALLED INTO THE GROUND BEFORE <br /> Fari HEAD AND TIGHTEN THEI <br /> r PROCEEDING WITH STEP/3. <br /> HEX NUT. TMS WILL DRAW <br /> THE TWO TOGETHER AND THREAD LOOSE END OF STRAP `,LOCK THE SYSTEM WTO Il"S THROUGH SLOTTED TENSIONING BOLTFINAL POSITIONTION ATTACHED TO TENSIONING HEAD OFANCHOR. TIGHTEN$LOTTED TCN-SIONING BOLT A MINIMUM OF 5 <br /> TIMES A UNTIL ALL SLACK IN STRAP <br /> IS REMOVED. IIIW <br /> FRAME TIE WITH BUCKLE <br /> A <br /> etL <br /> in <br /> '`I I <br /> E <br /> rno <br /> n <br /> 1.) THREAD 7 LENGTH OF FRAME TIE 2.)NEXT.THREAD LONG END OF STRAP 3.)DIAGRAM SHOWS STRAP IN POSI- <br /> T STRAP THROUGH STRAP BUCKLE AS BETWEEN FRAME AND FLOOR OF TION AROUND FRAME AND THROUGH <br /> SMOWN HOME. BRING STRAP THROUGH BUCKLE. IT IS IMPORTANT TO REMOVE <br /> o BUCKLE AS SHOWN IN DIAGRAM ALL SLACK FROM SYSTEM. • <br /> O AND FASTEN TO ANCHOR HEAD. <br /> IN <br /> nO FRAME TIE S <br /> C <br /> NO WALE <br />