Laserfiche WebLink
1,/ REV!' BY: DATE: PER: SHEETS: 12' x 60' MOBILE BUILDING A. Ri s, <br /> KAH 10-15-12 SUBMITTAL wg�ti°F wnsyA, Le O <br /> 1 ► � � 1TM BOEING Ls./ .1. pct <br /> MODERN BUILDING SYSTEMS. INC. <br /> TEt.EPHONE: (503) 749-4949 FAX: (503) 749-4950 21543 • <br /> P.O. BOX 1p• 9493 PORTER ROAD •AUMSVILLE. OR 97325 EVERETT WASHWGTON �AIST • <br /> REUSE OF DOCUI'ENTS W J <br /> THIS OGCUNENf MD TI-E LS NFE <br /> E IDEAS MD DESIOCORPORATED IN IS TI-E PROPERTY FOUNDATION DETJ1W5 _ <br /> OF I'TET N BUILDING SYSTEMS, INC. AND IS NOT To BE USED. IN)HOE CR IN PARE. C MODERN BUILDING SYSTEMS. INC. 2012 N <br /> FOR ANY ODER USE OR PROJECT WITHOUT WRITTEN AUTHORIZATION. <br /> STRAP TENSIONING INSTRUCTIONS: g FRAME TIE WITH HOOK <br /> 4.) ONCE TENSIONED TO THE <br /> Ai* <br /> /� POINT THAT COUNTER- ., <br /> / j CLOCKWISE RESISTANCE <br /> �/ APPEARS, A 5END WRENCH SH OPEN BE 1.) ATTACH FRAME HOOK TO TOP, `' <br /> I.-: /(,,,Iii ` '��I USED TO BOLD TFEDSQUARE INBOARD LOCATION OF I-BEAM. <br /> �'� '1� ' ATTACFED <br /> NECK WHILE RESPOSITION TO FRAME AT POINTSCLOSETSTO <br /> I IMG THE 5/16' TENSION FLOOR SUPPORTS.) , <br /> IMG WRENCH WHICH WILL <br /> I M ENABLE CONTINRED AND <br /> FINAL TENSIONING. REPEAT <br /> 1.) 2.) 3.) AS REQUIRED > > <br /> INSERT THE TENSION BELT INTO TI-E PLACE TFE STRAP END THROUGH THE BEND THE STRAP AT 90 DEGREES 2.) KEEPING IN LINE WITH TI-E HOOK. > <br /> ANCHOR FEAD AND LOOSELY ATTACH SLOTTED SHANK OF THE TENSION AND WITH THE USE OF 15/16' WRAP GALVANIZED STRAP COM- <br /> THE IAC NUT BOLT AND BRIM FLUSH-Y TO TFE OP- SOCKET OR OPEN-END WRENCH. PLETELY AROUND I-BEAM. <br /> POSITE SIDE CF TI-E SHANK. ROTATE IN A CLOCKWISE MANNER V <br /> WRAPPING THE STRAP AROUND THE A <br /> SHANK OF THE TENSION BOLT. <br /> 5.) ONCE FULLY TENSION D, —1 <br /> ALIGN THE SQUAB NECK OF <br /> WARNING CAREFLLLY INSPECT EACH ANCHORING LOCATION FOR HAZARDOUS UNDERGROUND WIRING. CONSULT <br /> TI-E BELT WITH TIE SQUARE 3.) `A1CIKR MUST BE SECURELY <br /> LOCAL UTILITY COMPANIES OR BUILDING AUTHORITIES AS IS NECESSARY. \ <br /> 4,L.-- ;,I RECESS IN THE ANCHOR INSTALLED INTO TI-E GRORND BEFORE <br /> HEAD AND TIGHTEN THE PROCEEDING WITH STEP °3. 4" <br /> FEX NUT. THIS WILL CRAW <br /> TI-E TWO TOGETHER AND 1FREAD LOOSE END OF STRAP .-. 1„p <br /> III LOCK THE SYSTEM INTO ITS TI-ROUGH SLO1 ILL) TENSIONING BOLT 4i, <br /> 1 TQ7 <br /> FINAL POSITION. ATTACHED TO TENSIONING HEAD OF <br /> ANCHOR. TIGHTEN SLO11EU TEN- , I <br /> SIONING BOLT A MINIMUM OF 5 \ <br /> TINES & UNTIL ALL SLACK IN STRAP , <br /> IS REMOVED. \/ <br /> EFRAME TIE WITH BUCKLE <br /> 'If40144k <br /> .e3 •45TAI <br /> 4 <br /> 4b. II <br /> 1.) TI-READ 7' LENGTH CF FRAME TIE 2.) NEXT. TI-READ LONG END OF STRAP 3.) DIAGRAM SHOWS STRAP IN P0S1- <br /> STRAP 11-ROUGH STRAP BUCIQE AS BETWEEN FRAME AND FLOOR OF TION AROUND FRAME AND THROUGH <br /> SHOWN. FICHE. BRING STRAP THROUGH BUCKLE. IT IS INPORTANT TO REMOVE <br /> BUCKLE AS SHOWN IN DIAGRAM ALL SLACK FROM SYSTEM. <br /> q AND FASTEN TO ANC)-DR I-EAD. <br /> N <br /> FRAME TIE ( ;7II) <br />