Laserfiche WebLink
. <br /> INSPECTION REPORTp.,0 G <br /> ^„,,� Date `_ 140 Permit: e?- --------- <br /> D t <br /> Contractor: Bal VI e,._i.,u --tlt <br /> _ C - <br /> Owner: 130e-illy <br /> Site Address: 300 3 ta a/9 iv <br /> TYPE OF INSPECTION REQUESTED�S`"d 3 <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ailing Grid ❑Drywall Nailing ❑Plumbing Final <br /> Electrical Final ❑Shear Nailing GAS PIPE <br /> SI E WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid • ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATI • <br /> ❑ APPROVAL [4—P TfTIA PPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. CTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION Ili <br /> ❑ UNABLE TO PERFORM INSPECTION: .__ <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> OK ‹.44 <br /> &'.>e L_zATI ,,,..)___G fr____ _. /9-c_44.-ei <br /> • <br /> Inspect Date: C AF <br /> DR(10/06) DATABAR,INC. <br />