Laserfiche WebLink
EI <br /> 0 C) CONSTRUCTION NOTES: <br /> I>PIPES TO BE SINGLE WALL(PVC1 OR PVDF1)INSIDE <br /> BUILDING 45-08 OR INSIDE SECONDARY CONTAINMENT. <br /> I QI PIPES TO BE DOUBLE WALL(PVC 2 OR PVDF2)OUTSIDE <br /> 0 „..._ OF BUILDING 45-08 OR SECONDARY CONTAINMENT. <br /> 1.3._-.INSTALL INTERCONNECTING PIPING BETWEENEW <br /> N <br /> 1 LE Li _ <br /> PROCESS EQUIPMENT INCLUDING CLARIFIER,SLUDGE <br /> PURGE AND RECYCLE PUMPS,MEDIA FILTER FEED TANK, <br /> I I I MEDIA FILTER FEED PUMPS,AND TERTIARY POLYMER <br /> /- DILUTION. <br /> 2”-FE-PVC 1-540 <br /> I I ." -(FERRIC FILL) <br /> P. <br /> 1/2"-SA-PVDF1-516 <br /> -(TO CHROME REDUCTION <br /> I I <br /> TANK) <br /> I <br /> B <br /> 4 <br /> '"2 <br /> in 1 I i •6 -.1 <br /> (TsKuADoET_ECTIO4k 4, NE <br /> . - — — — — — Mt,ml <br /> _ _ <br /> - :0 :;,-'72-E4' <br /> 0 <br /> FriAZIk 1.-FE-PVC 1-542 I .--"-_ -''.'-'4--- <br /> HBM161 M517 ./..,-(TO COAGULATION TANK) <br /> 3.-1W-PVC 1-310 <br /> 'Mt't7-aTh <br /> 0 ,..,.- / / (10 MEDIA FILTERS) <br /> 2 I o o g I 3/4"-IW-PVC 1-380 ME/ <br /> M .- g 'c-,-+ ffl ,....,--(TO POLYMER TERTIARY 571r4t4,1 <br /> -co <br /> "...‘7,e, 1. nf DILUTION STATION) <br /> W:(2:.2V'LLI'T'itiLki3 I , 1 ... <br /> '-'`'.'1-`•Z&-'••'.t&-a.2 <br /> 2 t_ <br /> 1 1/2"-51.—vc,-280 Il I I I ' <br /> (TO SLUDGE HOLDING TANK) .'• <br /> \_4*-IW-PVC 1-261 <br /> " Z1 (CLARIFIER EFFLUENT) <br /> 1 <br /> 1 , 1 1/2"-SL-PVC 1-270 <br /> v <br /> P-I <br /> 2 (PUMP EEFLUENT) -,.. <br /> I IIrA <br /> 1 1/2"-SL-PVC 1-273_ j <br /> 4111 <br /> HBM161-14517- 7 — _ <br /> _ _(10 FLOCCULATING CLARIFIER)- <br /> .....-L., <br /> I LEAK DETECTION I .-3/4"-IW-PVC 1-380 5 I <br /> (VISUAL) 3"-1W-PVC 1-250 3 <br /> 3/4"-PO-PVC 1-571 <br /> 404111‘11 IIIIMMIIIIV <br /> I <br /> At.set41 - <br /> • <br /> 1 / <br /> 4 lk <br /> I <br /> • .... III i • <br /> ', <br /> e, 1 FloccULATINC <br /> I <br /> I • CLARIFIER <br /> 4,.. 10600 GAL <br /> (T-260) <br /> C) <br /> HIGH BAY PROCESS PIPING PLAN <br /> 10' / <br /> A <br /> / <br /> SCALE: 1/4" = 1.-0" <br /> I <br /> r KEY PLAN <br /> SCALE: NTS <br /> t' <br /> 1/4"= 1-0" <br /> ] <br /> 1 <br /> g 100%DESIGN-ISSUED FOR CONSTRUCTION 5 Stantec <br /> DRAWN ITOE RWAWON <br /> SYM REVISION BY APPROVED DATE SN REVISOR BY APPROVED WOACCEPTABILITY SERGIYENKO 3,20.18 SUB <br /> E '3 <br /> HIGH BAY PROCESS CURRENT PIPING PLAN ORIG .520 18 <br /> - <br /> 1---AW.., <br /> THIS DESIGN AD/DR <br /> WEAK <br /> GJAONP8HPGHEiOK <br /> SPECIFICATION IS APPROVED LETyE.FN°i <br /> 3.20.18 <br /> MEE H,S-Th'-SR TREATMENT F LP NT SHEET <br /> - 4PREYED B DEPTDATEL. <br /> 32018 BUILDING 45 HBM161 C <br /> i <br /> ) <br /> •;?' WEAKLEY 3.20.18 <br /> I— ",,,Z,'.',.',"0' APPROVED DWG NO. <br /> HARRIS 3.20.18 MECHANICAL MASTER EVERETT, WA 45-08-FIBM161 <br />