Laserfiche WebLink
0 LEGEND & SYMBOLS <br /> TYPICAL OF 4 ZS TYPICAL OF 2 HV TYPICAL OF 3 HV <br /> 1. FOR MID SYMBOLS&NOTES SEE SHEETS M310&M311. <br /> OPND SPEED AUTO START RUN FAULT SPEED AUTO START RUN FAULT OPND D� OPND FLOW <br /> (ZS-01 YI-11-XC XI A 1(SC-lrYI (XOXI V XA ) (zsoYzsc\ (ZS-0.1 m <br /> 3 HV-201A,IN-2018 M-201 ) M-202 ) HV-201,HV-203 HV-204,IAI20S, 11T-201GENERAL NOTES <br /> 002 <br /> 07Ml-202A,110-2028i I I I I I I I <br /> (I > mOF 100 GPM.iOOO O O O 4 O O O O O DURING COMMISSIONING,PUMP WAS UNABLE TO <br /> O © HF WILL L' <br /> a — O - - OOO -6- ± 4— C —O—O 0 -j— <br /> SIGN FLOW WITH ADDED <br /> BEUSEDOR LOWER INFLUENT RATES<7S GPM, <br /> 6 ' ' i A 12 .PUMP P-202 WAS UPGRADED FOR HIGHER ROW AND <br /> a D O O O O O O O O 6 HEAD CAPACITY.PUMP,MOTOR AND VFD UPGRADED TO <br /> S 1---0--1-0---01---0--,10---0-1 L_-0-1-0---01-T-0--10---0, \ . ACHIEVE 100 GPM.PUMP CAPACITY WILL EXCEED 100 <br /> i GPM,WHICH IS THE NW?HYDRAUUC UMR.LTD IS <br /> — — i — SET TO NOT EXCEED HERTZ THAT ACHIEVES 100 GPM. <br /> Rd /Rb \ \ 5 <br /> / \° / ' 1 y <br /> YS YS <br /> 201 O1 HOA 202 1 HOA . ..- <br /> g CONSTRUCTION NOTES <br /> VFD O ® VFD HS / NEW UTREATMENT PROCESS PIPING,MIXER,AND CHEMICAL <br /> ® m 202 . i <br /> ' jj NEW INFLUENT FEED PUMP INCLUDING PUMP,MOTOR,AND VFD. <br /> ® ® . UTILIZE EXISTING POWER AND CONTROLS WIRING.NEW GPO TO <br /> i' FAULT — FAULT — — O BE INSTALLED IN MCC. <br /> SODIUM BISULFITE ADDITION TO BE LOCATED ON WEST SIDE <br /> P . ....• . GARAGE DOOR. <br /> . ! 4'�^ SULFURIC ACID ADDITION TO 8E LOCATED ON EAST SIDE OF <br /> ,-- . GARAGE DOOR,DOWNSTREAM OF MAGNETIC FLOW METER,AND <br /> PRIOR TO INLINE MIXER. <br /> . ,- i <br /> / INSTALL INUNE MIXER IN VERTICAL SECTION OF PIPE PRIOR TO <br /> . T-210.MIXER TO BE LOCATED AT LEAST 4 FEET DOWNSTREAM <br /> i OF FLOW METER. <br /> . - . . . . <br /> .--- <br /> ..-'• 6� ADD FLOW RATE FOR PUMP PER BOEING'S REQUEST.NO <br /> i CONSTRUCTION AC'TMTY. <br /> . • . . . . <br /> i <br /> . • . . . <br /> . . O . <br /> . . <br /> . . <br /> . . . . . . i <br /> / / SODIUM BISULFlTE - i <br /> . • 1/2'-58-SS-522 FIT <br /> . ,_ - Dwg.No.M324 <br /> ZSO " 201 <br /> ▪ . - . - 201 <br /> ZSC . ZOO <br /> p�� •CV-527 <br /> . . . , . 201 CP �07 ZSO <br /> . .IN-528 205 I\� <br /> IV' TO CHROME REDUCTION TANK <br /> • • 200 3`-AY-PVCI-200 <br /> Tel 11 101 Q 1 T I IXI 1 I U' Dwg.No.M316 <br /> . . . . . HV-201 NV-207 NV-204 MJ-205 <br /> I HV-212 MON-201 MA-213 <br /> . FLU-201 HV-517$ <br /> ZSO . ZSO � ZSO NV-209 • O <br /> 201 018 T81-- <br /> . �_2O8 CV-516 • <br /> FROM STORAGE/ 3'-IW-PVC1-202 <br /> EQUALIZATION TANKS © @ Ir <br /> > Dw.No.M313> L.•' �� ..c-- <br /> 16/-20113 —11T �� FLOW METER 00-214 <br /> 9 HV-201A x_20' HV-2028 CALIBRATION (TYP) <br /> P-201 P-202 . <br /> ` <br /> \ \ \ \ lilw- <br /> OUTSIDE • INSIDE :. <br /> ZSO k <br /> 3'-IW-PVC1-201 <br /> 203 <br /> TO SUMP DISCHARGE SULFURIC ACO <br /> 3'-11V-PVC1-204 <br /> <Dog.No.M329 < 1 Dwg.No.M323 i/2x1 <br /> HV-203 <br /> f <br /> gi <br /> P-201 P-202 FLU-201 <br /> S IN II I 'UMP IN 0 7 I .1 MP FLOW METER <br /> 1 (100 GPM) (100 GPM) <br /> 0 <br /> 1 <br /> 0 0 e <br /> ,..., <br /> 100% DESIGN-ISSUED FOR CONSTRUCTION <br /> ® Stantec <br /> SYM tit B! APPROVED DATE EN REV@ON APPROVED DATE ACCEPTABILITY MANN EvUt SUBTITLE TORRENT RE\RSION SYMBOL DATE <br /> _ • THISCHESERCKS/ 3.zo.18 P&ID-INFLUENT WWTP C .r <br /> A WHIP-ISSUED FOR CONSTRUCTION-RECORD 10011818 URS TORRE 11.14.12 - °* ASO w SPECIFICATION <br /> DESIGN /0R 'WEMLL'BY 3.20.18 <br /> B ECN a-ISSUED FOR CONSTRUCTION 10011818 URS MOCKOS 03.22.13 ` Se.w 4A w. SPECIFICATI N IS APPROVEDSHEET <br /> rf1:► rl APPROVED IVY DEPT. BATE WEAKLEY 3.20.18 / <br /> BOi,��® ~ CHET E D n E WASTEWATER TREATMENT PLANT M 315 '� f <br /> C VW-MODIFICATIONS MWH WEAKLEY 12.05.16 " b' <br /> CHECKED <br /> ro JOHNSON 3.20.18 APPROVED BUILDING 45-08 408 NO.��eed y9 d, WEAKLEY 3.20.18 <br /> SRI° 3.20.18 MECHANICAL MASTER EVERETT.WA D NO. 45-08-M315 <br />