Laserfiche WebLink
• <br /> Frame bitirber Sole <br /> Frame Clearances <br /> Part Mara Width Thick WeebT'hk. Depthl Denth2 Approx.Weight Horiz. Clearance between members 1(CX001) and 4(C1002): 34'-11 1/2" <br /> CK001 1 8.0000 .2500 .1644 1'-4 1'-4" 16'-10 5/8" 433# Vert. Clearance at matter 1(CX001): 15'-7 11/16" <br /> - RBX001 2 5.0000 .2500 .1345 1'-6" 1'-2 15/16" 17'-8 3/16" 332# Vert. Clearance at member 4(CXI)02): 15'-7 11/16" <br /> RBX002 3 5.0000 .2500 .1345 1'-2 15/16" 1'-6" 17'-8 3/16" 328# Finished Floor Elevation =100'-0" (Unless Noted Otherwise) <br /> CC002 4 8.0000 .2500 .1875 1'-4" 1'-4" 16'-10 5/8" 453# <br /> a EPX001 5 5.0000 .1345 .1345 9" 9" 2'-5 1/2" 20# <br /> (71) 18' <br /> 1 <br /> 18'-10 13/16" 1.000:12 18`-10 13/16" 1.000:12 <br /> 5 @ 2'-6" © © 5 @ 2'-6" <br /> © Q9 © 0 0 Q <br /> fo fo <br /> i <br /> CO <br /> m <br /> ® es <br /> a g xar0o2 q <br /> REM001 <br /> i3C175120 115'-0" <br /> — L <br /> OC175120 <br /> 0 <br /> I <br /> o io <br /> �' <br /> o c <br /> I <br /> \ \ 100'-6" 100!..-6" \ Ci � a <br /> Cr coil* <br /> z x <br /> re <br /> / 18'-10" 18'-10" <br /> ld ,�'lr 47 R�9CL <br /> ' �� <br /> / 37'-8" e y'T E <br /> ONAt.. <br /> 8 19'-6 13/16" Ridge Ht. BL BL - <br /> 7 11 1!s^ EIS moss SECTICN AT F LINE(S) C 2/25/2016 <br /> 6 2 @ 1'-3" <br /> O Bolt Connection & Plate Schedule <br /> 5 11 1/16" <br /> 4 1'-5" Id Qty Grade Bolt Bolt Plate Rows Rows Tension Washer PartNo <br /> Dia. Length Thick. Out In Bolt <br /> 3 1'-3" <br /> A 8 E1852. 3/4" 2 1/2" 5/8" 2 2 Yes Yes 0097390 <br /> 2 1'-6 11/16" B 12 51852 3/4" 2 1/4" 1/2" 1 2 Yes Yes 0097389 <br /> 1 2'-11 15/16" <br /> Dimension Shape Name=Skydrol Mule Storage Wall 4,Frame 1 FOR CONSTRUCTION <br /> 1< 1.USE 1/2 X 1 1/2 A325-N BOLT(49080)AND NUT(47120) THE VP ENGINEER'S SEAL APPLIES ONLY THIS DRAWING,INCLUDING THE INFORMATION HEREON,REMAINS THE PROPERTY OF <br /> W/O WASHERS.SNUG TIGHTEN BOLTS FOR ALL SECONDARY CONNECTIONS, TO THE WORK PRODUCT OF VP AND VP BUILDINGS. IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED VP Buildings <br /> FRAME CROSS SECTION AT FRAME LINE(S)C <br /> SECONDARY CLIP CONNECTIONS,AND FLANGE BRACE CONNECTIONS, DESIGN AND PERFORMANCE IN THE APPLICABLE PURCHASE ORDER AND SHALL NOT BE MODIFIED,REPRODUCED 3200 Players Club Circle Memphis TN 38125 <br /> UNLESS NOTED OTHERWISE. REQUIREMENTS SPECIFIED BY VP.THE OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VP <br /> 2.SLOT REINFORCEMENT PLATES NEED NOT BE LOCATED ON THE SAME VP ENGINEER'S SEAL DOES NOT APPLY RUII DINGS REI' DATE BY OESCRIVnON BU4DER Commercial Design Consultants 18423031 <br /> i SIDE OF THE WEB AS THE HILLSIDE WASHER. TO THE PERFORMANCE OR DESIGN OF THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE 1 02/22/2016 SHV FINAL DRAWINGS CUSTORER Boeing Commercial Airplane Group DATE <br /> g ANY OTHER PRODUCT OR COMPONENT GOOD QUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS <br /> DRAWING,DETAILS REFERENCED IN THIS DRAWING,ALL APPLICABLE VP BUILDINGS �OCAT OILD/N Everett,Washington VP BUILDINGS 3/28/2015 <br /> a FURNISHED BY VP EXCEPT TO ANY - w, <br /> DESIGN OR PERFORMANCE ERECTION GUIDES,AND INDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, PN°'ECT Boeing Skydrol Mule Storage VARW PRUDEN <br /> oSHwwcr4ECK V COP <br /> A BlueScope Steel Company <br /> REQUIREMENTS SPECIFIED BY VP. INCLUDING THE CORRECT USE OF TEMPORARY BRACING. NTS MADER'S PM 15-1208 VPC VERsION. 2015.2c PA 6 <br /> FILENAME: C:\Vision\Building Files115-023031\Boeing Skydrol Mule Storage_FRAME CROSS SECTION AT FRAME LINE(S)C.dwg SAVE DATE,2/22/2016 SAVE ME:08:59:23 tASTSAVEoBy; vargs adASAnofBlueScoyeBuildings North Ame, Inc. <br />