Laserfiche WebLink
Covering Schedule Trim Schedule <br /> Id Qty Length Type Gage OP Fin= Color Id Parts Color Details <br /> #6 28 18'-7 1/4" SSR 24 2 K YW 11 SRCN'06, (6)SRCF'10, SRC106, (6)SRCM10 Cool Egyptian RC34A7, RC34H1, RC34H3, RC34H4 <br /> #7 28 18'-7 1/4" SSR 24 2 K YW Mite <br /> Cper. Code:2 , SQ <br /> Finish:K (Kynar) <br /> Color:YWxool Egyptian White <br /> Cf) O O <br /> © \ r - --- - 7 <br /> I (28)#7 I <br /> IT Tl I <br /> I <br /> rn <br /> Aa 4:k <br /> (28)#6 <br /> 0 'M- \ L --- ----- - J <br /> MULE CONTROL STRIPS <br /> Use at panel mid-point when panel is 38.0 ft or longer <br /> Use at endlaps, first clip frau ridge and first frau eave <br /> Ice Damming Conditions Exist "1_0 otio <br /> - The roof panels on this project has been 55'-0" ,4" ( 0 it" C? <br /> detailed for a UL90 rating Construction #113 or 113A BL BI 'Q -4 d <br /> 1 1'-6" Starter Panel (Cut nim. = 1'-7") POOP COVERING PLAN - <br /> ❑ Dimension Key "P 'Y <br /> y;•.A. a'40 I.- <br /> O .A <br /> JONAH- i <br /> Fastener Schedule 2125/2016 <br /> • Part Description <br /> 55307 (T-3) 1/4-14-x 1 1/4", 5/16" Hex Ed <br /> Shape Name a Skydrol Mule Storage FOR CONSTRUCTION <br /> 1.PRE-DRILLING 1/8 DIAMETER HOLES FOR STRUCTURAL FASTENERS THE VP ENGINEER'S SEAL APPLIES ONLY THIS DRAWING,INCLUDING THE INFORMATION HEREON,REMAINS THE PROPERTY OF <br /> MAY BE REQUIRED FOR HEAVY GAGE NESTED ZEE's AND/OR FASTENERS TO THE WORK PRODUCT OF VP AND VP BUILDINGS. IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED - VP Buildings <br /> TO STRUCTURAL BEAMS DESIGN AND PERFORMANCE IN THE APPLICABLE PURCHASE ORDER AND SHALL NOT BE MODIFIED,REPRODUCED 3200 Players Club Circle Memphis TN 38125 ROOF COVERING PLAN <br /> 8 2.STEEL PANELS ARE AN INTEGRAL PART OF THE STRUCTURAL SYSTEM. REQUIREMENTS SPECIFIED BY VP.THE OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VP <br /> 5 REMOVAL OR ALTERATION WITHOUT PRIOR AUTHORIZATION IS PROHIBITED. VP ENGINEER'S SEAL DOES NOT APPLY BUILDINGS REV DATE BY DESCRIPTION BUILDER Commercial Design Consultants J15#023031 <br /> `a 3.DUE TO MANUFACTURING LIMITATIONS SHORT PANELS MAY REQUIRE TO THE PERFORMANCE OR DESIGN OF THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE 1 02/22/2016 SHV FINAL DRAWINGS CUSTOMER Boeing Commercial Airplane Group DATE <br /> FIELD CUTTING,SEE THE COVERING SCHEDULE FOR CUT LENGTHS. ANY OTHER PRODUCT OR COMPONENT GOOD QUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS LOCATION 3/28/2015 <br /> - 4.SEE JOB DETAILS FOR COVERING AND TRIM FASTENER SPECIFICATION. FURNISHED BY VP EXCEPT TO ANY DRAWING,DETAILS REFERENCED IN THIS DRAWING,ALL APPLICABLE VP BUILDINGS Everett,Washington VP BUILDINGS <br /> LLBoeingSkydrol Mule Storage ...mem. <br /> DRAWN CHECK <br /> O PROJECT <br /> � DESIGN OR PERFORMANCE ERECTION GUIDES,AND INDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, ky 9 A sores SHV_ COP <br /> REQUIREMENTS SPECIFIED BY VP. INCLUDING THE CORRECT USE OF TEMPORARY BRACING. NTS BUILDER'S PO' 15-1208 Blue c Steel 15T.2fy PAGE 19/!a <br /> - <br /> AM <br /> FILENE C:\Vision\Building Files115-0230311Boeing Skydrol Mule Storage_ROOF COVERING PLAN.dwg SAVE DATE.2/22/2016 SAVE nr,e:09:00:17 LAST SAVED ay: vargs aama,oti.eScope BA NDW Anima,mc <br />