Laserfiche WebLink
Covering Schedule Trim Schedule <br /> Id Qty Type Start length Gage OP Fin. Color Direction Id Parts Color Details <br /> - #2 19 VR 2'-11 3/8" 24 1 K YW Left to Right Ti (4)HPS14 Cool Egyptian White WC24B2 <br /> Oper- Code:1S, SQ T2 (2)EG201, EG161, (6)GRA10, (5)PCA10A, <br /> Cool Egyptian White RC03A2, RC32A1, 13C38E2, RC61A6V324, WCO4H1, W,liE1 <br /> ES.nish:K*KEL (Kynar) <br /> PCA05A, (29.3)STR4 <br /> Color:Y[,T=Cool Egyptian White 73 5CE75, (2)CP510, DNl, (4)DST1 Cool Egyptian White RC38P1 <br /> : C <br /> r <br /> T2 <br /> 1 1 . <br /> I (19)#2 1 <br /> 1 <br /> 1 I <br /> Tl I I <br /> 0 <br /> t <br /> Op <br /> 0 <br /> I OPEN to15' Elev. <br /> w <br /> ri <br /> gl P <br /> 1. 55'-0" I, <br /> BL BL <br /> EN <br /> COVERING ELEVATION AT 1 4 W ,17 <br /> �V- 0 *te d <br /> ir <br /> Fastener Schedule 2X <br /> Part Description <br /> 0097584-101 (T-2) #12-14 x 1 1/4", 5/16" Hex Hd, SS Cap w/Washer '{� k.47' '/ <br /> 0097581-101 (T-1) 1/4-14 x 7/8", 5/16" Hex Hd, SS Cap w/Washer �+� �:'(' .lt' <br /> �fi'ONAL <br /> 2/25/2016 <br /> Shape Name=Skydrol Mule Storage,Wall=2 FOR CONSTRUCTION <br /> 1.PRE-DRILLING 1/8 DIAMETER HOLES FOR STRUCTURAL FASTENERS THE VP ENGINEER'S SEAL APPLIES ONLY THIS DRAWING,INCLUDING THE INFORMATION HEREON,REMAINS THE PROPERTY OF <br /> MAY BE REQUIRED FOR HEAVY GAGE NESTED ZEE's AND/OR FASTENERS TO THE WORK PRODUCT OF VP AND VP BUILDINGS. IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED VP Buildings <br /> "' TO STRUCTURAL BEAMS DESIGN AND PERFORMANCE IN THE APPLICABLE PURCHASE ORDER AND SHALL NOT BE MODIFIED,REPRODUCED 3200 Players Club Circle Memphis TN 38125 COVERING ELEVATION AT <br /> R 2.STEEL PANELS ARE AN INTEGRAL PART OF THE STRUCTURAL SYSTEM. REQUIREMENTS SPECIFIED BY VP. THE OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VP <br /> 5X023031 <br /> REMOVAL OR ALTERATION WITHOUT PRIOR AUTHORIZATION IS PROHIBITED. VP ENGINEER'S SEAL DOES NOT APPLY BUII DINGS "ev Dare BY DESCRIPTION BUILOEH Commercial Design Consultants <br /> i 3.DUE TO MANUFACTURING LIMITATIONS SHORT PANELS MAY REQUIRE TO THE PERFORMANCE OR DESIGN OF THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE 1 02/22/2016 SH\'FINAL DRAWINGS cusr."E"Boeing Commercial Airplane Group DATE <br /> w FIELD CUTTING,SEE THE COVERING SCHEDULE FOR CUT LENGTHS. ANY OTHER PRODUCT OR COMPONENT GOOD QUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS Troll 3/28/2015 <br /> a 4.SEE JOB DETAILS FOR COVERING AND TRIM FASTENER SPECIFICATION. FURNISHED BY VP EXCEPT TO ANY DRAWING,DETAILS REFERENCED IN THIS DRAWING,ALL APPLICABLE VP BUILDINGS Everett,Washington VP BUILDINGS DRAWN/CHECK <br /> i DESIGN OR PERFORMANCE ERECTION GUIDES,AND INDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, PROJECT Boeing Skydrol Mule Storage v Oe " SHV COP <br /> Scopeny <br /> REQUIREMENTS SPECIFIED BY VP. INCLUDING THE CORRECT USE OF TEMPORARY BRACING. - Buaoeas oox a eV steel enc <br /> NTS 15-1208 vEasioN: 20152c (--,--- <br /> VPC1/ <br /> FII.Ewv.,<:C:Wision\Building Files\15-0230311Boeing Skydrol Mule Storage COVERING ELEVATION AT 1.dwg SAVE Dare:2/22/2016 SAVE TIME::09:36:53 LAST SAVE,BY: vargs ad,, wewese,eeuano:No. Ir. _ <br />