Laserfiche WebLink
Covering Schedule e Trim Schedule <br /> Id Qty Type Start length Gage OP Fin. Color Direction Id Parts Color Dei-A1 14 <br /> #5 19 VR 2'-11 3/8" 24 1 K YW Left to Right T1 (4)HT514 Cool Egyptian White WC24B2 <br /> Oiler. Code:1 Q, SQ T2 (2)EG201, EG.61, (6)GPA10, (5)PCA10A, <br /> Cool Egyptian yBrite RCO3A2, RC32A1, R 38E2, 2iC61A6, RCY324, WC04H1, W. 1F1 <br /> PCA05A, (29.3)STR4 <br /> Finish:K=KXL (Kynar) <br /> Color:YW=Cool Egyptian WhiteT3 5CE75, (2)CP510, t8 1, (4)DST1 Cool Egyptian White F 38P1 <br /> Y <br /> T2 <br /> I I I <br /> I 1 <br /> I (19)#5 I <br /> //7////:// <br /> o OPEN to15' Elev. <br /> in <br /> ss'-o" <br /> I <br /> SL <br /> 4% NLLEJV <br /> C 7ER� ELEVnTICN AT 2 4 <br /> C� G',a O <br /> cn " O <br /> Fastener Schedule <br /> e <br /> Part Description R1 Q;' <br /> At <br /> 0097584-101 (T-2) #12-14 x 1 1/4", 5/16" Hex Hd, SS Cap w/Washer Q 47 " Q 4/ <br /> 0097581-101 (T-1) 1/4-14 x 7/8", 5/16" Hex Hd, SS Cap w/Washer *40l 'Teti <br /> 'ONAL <br /> 2/25/2016 <br /> Shape Name=Skydrol Mule Storage,wall"4 FOR CONSTRUCTION <br /> 1.PRE-DRILLING 1/8 DIAMETER HOLES FOR STRUCTURAL FASTENERS THE VP ENGINEER'S SEAL APPLIES ONLY THIS DRAWING,INCLUDING THE INFORMATION HEREON,REMAINS THE PROPERTY OF <br /> MAY BE REQUIRED FOR HEAVY GAGE NESTED ZEE's AND/OR FASTENERS TO THE WORK PRODUCT OF VP AND VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED VP Buildings <br /> TO STRUCTURAL BEAMS DESIGN AND PERFORMANCE IN THE APPLICABLE PURCHASE ORDER AND SHALL NOT BE MODIFIED,REPRODUCED 3200 Players Club Circle Memphis TN 38125 COVERING ELEVATION AT 2 <br /> 8 2.STEEL PANELS ARE AN INTEGRAL PART OF THE STRUCTURAL SYSTEM. REQUIREMENTS SPECIFIED BY VP.THE OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VP <br /> x REMOVAL OR ALTERATION WITHOUT PRIOR AUTHORIZATION IS PROHIBITED. VP ENGINEER'S SEAL DOES NOT APPLY BUD DINGS set DATE B'' DESCRIPTION B1ALOER Commercial Design Consultants 15#-023031 <br /> i 3.DUE TO MANUFACTURING LIMITATIONS SHORT PANELS MAY REQUIRE TO THE PERFORMANCE OR DESIGN OF THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE 1 02/22/2016 SHV FINAL DRAWINGS O°TOA1ER Boeing Commercial Airplane Group DATE <br /> 5 FIELD CUTTING,SEE THE COVERING SCHEDULE FOR CUT LENGTHS. ANY OTHER PRODUCT OR COMPONENT GOOD QUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS LOCAT'ON Everett,Washington 3/28/2015 <br /> ,. LL 4.SEE JOB DETAILS FOR COVERING AND TRIM FASTENER SPECIFICATION. FURNISHED BY VP EXCEPT TO ANY DRAWING,DETAILS REFERENCED IN THIS DRAWING,ALL APPLICABLE VP BUILDINGS VP BUILDINGS DRAWN/CHECK <br /> $ DESIGN OR PERFORMANCE ERECTION GUIDES.AND INDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, PRO'ECT Boeing Skydrol Mule Storage viRC0PRUDEN SHV OP <br /> A BWeSoope Steel Company <br /> REQUIREMENTS SPECIFIED BY VP. INCLUDING THE CORRECT USE OF TEMPORARY BRACING. NTS "-DE'S PO# 15-1208 vacvEnswre 2015.2c PAG 23,�g <br /> FILENAME C:Wision\Building Files\15-0230311Boeing Skydrol Mule Storage_COVERING ELEVATION AT 2.dwg SAVE DATE 2/22/2016 SAVE Tire 09:36:33 LAST SAVED BY: vargs a drvisonoBluesoopea North Anwmma,Inc <br />