Laserfiche WebLink
d <br /> Tyler, David D <br /> From: Rimorin, Raymundo A <br /> Sent: Friday, March 18, 2016 12:29 PM <br /> To: Tyler, David D <br /> Subject: FW:Construction Permit Submittal for Glycol/Skydrol Storage Buildings <br /> Hi Dave, <br /> Please see the response below. <br /> Thanks, <br /> Ray A. Rimorin <br /> Construction Management <br /> Major Projects, Everett, M/S OH-13 <br /> Mobile: 425-330-1807 <br /> Fax No. 425-342-5490 <br /> raymundo.a.rimorin@boeing.com <br /> From: Cameron Vest [mailto:CVest@imcoconstruction.com] <br /> Sent: Friday, March 18, 2016 12:10 PM <br /> To: Rimorin, Raymundo A <br /> Cc: Isaac Woodbury; Dilip Gargeya; Gomez, Martin H <br /> Subject: RE: Construction Permit Submittal for Glycol/Skydrol Storage Buildings <br /> Ray, <br /> See my comments in RED below. <br /> "If the perimeter trench drain and/or sump is external to the canopy foundation":Trench drain and sump are internal to <br /> the canopy foundation. <br /> "If the concrete slab being poured extends beyond the foundation footprint" :The concrete slab does not extend <br /> beyond the foundation footprint. <br /> "You can add in the necessary plumbing and/or mechanical items associated" :There are plumbing and mechanical on <br /> the project(Glycol tank mechanical piping, sanitary sewer tie-ins and the water line).Are they saying we can add these <br /> items to this permit, and avoid the mechanical permit requirement? <br /> CAMERON VEST L5 N o evroLtilh . <br /> Assistant Project Manager <br /> Mobile: 360.739.8125 p1 /zArL/tf livesirckei <br /> Corporate: 360.671.3936 <br /> Fax: 360.671.8808 <br /> 1 <br />