Laserfiche WebLink
Bracing Part Schedule <br /> - Part Qty Length Detail <br /> 0311S2407 2 24'-7" BR02H1 <br /> 0 0 <br /> o • I I <br /> N , <br /> pg <br /> I I <br /> I I <br /> 1 I <br /> 1-1 Ckl0 0 <br /> iI 0 <br /> I <br /> I <br /> e <br /> I <br /> I <br /> I <br /> Ic <br /> I <br /> /01 ac002 <br /> o o o ' <br /> l'-3" <br /> ____L ® M_ <br /> • <br /> -0 1 18'-0" NILE . <br /> p -° NdtP <br /> 20'-0" C+ F Srf '9� <br /> x K <br /> PRIMARY AND ROOF EMCIlJG PLAN <br /> 10 47 .g V 4,,,44 T'E�� <br /> fOMAL <br /> 2/26/2016 <br /> 1 1'-o„ <br /> Dimension Key Shape Name=Glycol Load and Unload FOR CONSTRUCTION <br /> • <br /> 1.USE 1/2 X 1 1/2 A325-N BOLT(49080)AND NUT(47120) THE VP ENGINEERS SEAL APPLIES ONLY THIS DRAWING,INCLUDING THE INFORMATION HEREON,REMAINS THE PROPERTY OF <br /> W/0 WASH <br /> Y CLIP ERS.SNUG <br /> TIGHTEN <br /> IGH BLTS FLANGE SECONDARY <br /> CONNECONNECTIONS, TO THE WORK PRODUCT OF VP AND VP BUILDINGS. IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED VP Buildings PRIMARY AND ROOF BRACING PLAN <br /> ANDBRACE DESIGN AND PERFORMANCE IN THE APPLICABLE PURCHASE ORDER AND SHALL NOT BE MODIFIED,REPRODUCED 3200 Players Club Circle Memphis TN 38125 <br /> 4 UNLESS NOTED OTHERWISE. REQUIREMENTS SPECIFIED BY VP. THE OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VP <br /> $ 2.SLOT REINFORCEMENT PLATES NEED NOT BE LOCATED ON THE SAME VP ENGINEER'S SEAL DOES NOT APPLY SU!DINGS REV DATE BY °Esc"°"°" 8U1UM <br /> Commercial Design Consultants <br /> 15-022921-01 <br /> SIDE OF THE WEB AS THE HILLSIDE WASHER. - TO THE PERFORMANCE OR DESIGN OF THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE 1 2/18/2016 DWM FINAL DRAWINGS CUSTOMER Boeing Shared Services DATE <br /> ANY OTHER PRODUCT OR COMPONENT GOOD QUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS LOCATION Everett,Washington. 2/18/2016 <br /> FURNISHED BY VP EXCEPT TO ANY DRAWING,DETAILS REFERENCED IN THIS DRAWING,ALL APPLICABLE VP BUILDINGS VP BUILDINGS DRAIME ECK <br /> - $ DESIGN OR PERFORMANCE ERECTION GUIDES,AND INDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, PROJECT Boeing Glycol Load/Unload Canopy IIA1GpPR10ei DWM cop <br /> REQUIREMENTS SPECIFIED BY VP. INCLUDING THE CORRECT USE OF TEMPORARY BRACING. A BvpC Steel Company 7 <br /> 0.:q•-)NTS BUILDERS PO" 15-1200.:q•-)VERSpe VERSION. 2015.2c PAGV � <br /> ALENAME:C:1Vision\Building Files115-022921-01145 BUILD ACAD FILE\P5 RF XNG Boeing Glycol Load and Unload Canopy_PRIMARY AND ROOF BRACING PLAN.dwg SAVE DATE:2/18/2016 SAVE-ME 14:52:15 LAST SAVED BY: morgd a sao,aseescocRNAer�NorthAmen.,Inc`J\ <br />