Laserfiche WebLink
Secondary Part Schedule Bracing Part Schedule <br /> Mark Part tick. Depth Detail Part Qty Length Detail <br /> G3 08Q911412AA00 0.0980 8 1/2" 03RS2410 2 24'-10" BRO2H1 <br /> ` O O <br /> T T <br /> 1 <br /> ® I <br /> 1I <br /> 1 <br /> G3 <br /> I <br /> I I <br /> I OPEN to 16'-0 5/8" Elev I <br /> I I <br /> I I <br /> j I <br /> I I <br /> I <br /> Is m <br /> ir4 s ..., <br /> I <br /> ZD <br /> ri <br /> I ' <br /> j I <br /> I I <br /> ,gyO <br /> 0. <br /> Or <br /> i 4.7.4'.01S;LV VLAEZ/ lit..) <br /> "Al di <br /> 13 Ae <br /> 7W4B0 'AO , 4 9 60 •4, <br /> 1 18'-0" t41 <br /> ',ONA �. " <br /> CL <br /> CL <br /> 20'-0" 2/26/2016 <br /> 2 l'-6 7/8" BL BL <br /> 1 l'-0" SECONDARY ELEVATION AT 2 <br /> Dimension Key Shape Name=Glycol Load and Unload,Wall=4 FOR CONSTRUCTION <br /> 1.UNLESS NO I'ED,USE 1/2 X 1 1/2 A325-N BOLT(49080)AND NUI(4/120) THE VP ENGINEER'S SEAL APPLIES ONLY THIS DRAWING,INCLUDING THE INFORMATION HEREON,REMAINS THE PROPERTY OF <br /> W/O WASHERS.SNUG TIGHTEN BOLTS FOR ALL SECONDARY CONNECTIONS. VP Buildings <br /> TO THE WORK PRODUCT OF VP AND VP BUILDINGS. IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED <br /> — <br /> 2.FLANGE BRACES ARE AN INTEGRAL PART OF THE STABILITY OF THE DESIGN AND PERFORMANCE IN THE APPLICABLE PURCHASE ORDER AND SHALL NOT BE MODIFIED,REPRODUCED 3200 Players Club Circle Memphis TN 38125 SECONDARY ELEVATION AT 2 <br /> _ STRUCTURAL SYSTEM AND MUST BE PROPERLY INSTALLED PRIOR TO ERECTION REQUIREMENTS SPECIFIED BY VP. THE OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VP <br /> OF WALL AND ROOF SHEETS. VP ENGINEER'S SEAL DOES NOT APPLY BIM DINGS REV DATE BY DESCRIPTION B1"'DER JOB <br /> Commercial Design Consultants <br /> % <br /> 15-022921-01 <br /> 3.REMOVAL OR ALTERATION OF ANY COMPONENT IS PROHIBITED. TO THE PERFORMANCE OR DESIGN OF THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE 1 2/18/2016 DWM FINAL DRAWINGS CUSTOMER Boeing Shared Services DATE <br /> ANY OTHER PRODUCT OR COMPONENT GOOD QUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS 1O ATION Everett,Washington 2/18/2016 <br /> VP BUILDINGS <br /> FURNISHED BY VP EXCEPT TO ANY DRAWING,DETAILS REFERENCED IN THIS DRAWING,ALL APPLICABLE VP BUILDINGS DRAwe�cRECK <br /> PROJECT Boeing Glycol Load/Unload Canopy <br /> v.—. DWM <br /> DESIGN OR PERFORMANCE ERECTION GUIDES,AND INDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, A 87ueScope Steel Comperry <br /> REQUIREMENTS SPECIFIED BY VP. INCLUDING THE CORRECT USE OF TEMPORARY BRACING. BUILDERS PAGE <br /> NTS 15-1208 VPC VERSION 2015.2c 16/23) <br /> FILENAME: C:\Vision\Building Filesl15-022921-011AS BUILD ACAD FILE1P16 Boeing Glycol Load and Unload Canopy_SECONDARY ELEVATION AT 2.dwg SAVE DATE 2/19/2016 sAVEnME:09:37:11 LAUTSAVED Ely: morgd a&mon of BlueScone Bun:Inns Ronhw„=nce,Inc <br />