Laserfiche WebLink
Covering Schedule Trim Schedule <br /> Id Qty Start length Type Gage OP Fin. Color Id Parts Color Detai1a <br /> #5 11 18'-7" SSR 24 2 K YW TI MJC1 Cool Egyptian RC38AJ <br /> Oiler. Code:2- Q, SQ White <br /> Finish:IC ff. Area) <br /> 12 RER10-130, RI�10, RSB10, RSC10 Cool Egyptian RC10A1, RC3QA1, RS10L5 <br /> ibite <br /> - Color:YW=Cool Egyptian White T3 EG201, (2)GRA10, (2)PC2i10A, (11.1)STR4 Cool Egyptian RC03A2, RC32A1, RC38E2, RC61A6,:RCV324, WC04B1, WC11F1 <br /> White <br /> T4 (2)5CE75, CP510 Cool Egyptian RC38R1 <br /> White <br /> T5 BS1, FPRFI, G C1, ME1 Cool Egyptian RC3 N1 <br /> White <br /> 0 0 <br /> •r. 1 <br /> 1 <br /> I <br /> I <br /> v r- <br /> LI <br /> t (11)#5 <br /> . r+t <br /> Pk,ILEA <br /> itt <br /> , , OgWA8.. 1 <br /> J <br /> if' 20'-0„ / <br /> t g "!4' <br /> "Ct it <br /> BL y'�.47 .9,oft ea Ar <br /> Ice Damming Conditions Exist <br /> The roof panels on this project has been" �,It ',ONAL. <br /> detailed for a DL90 rating Construction #113 or 113A <br /> ROOF aC JERING PIAN 2/26/2016 <br /> 1 1'-0" Starter Panel (Cut Dim. = 1'-1") <br /> — <br /> .. Dimension Rey: <br /> Shape Name=Glycol Load and Unload,Shape=Glycol Load and Unload FOR CONSTRUCTION <br /> 1.PRE-DRILLING 1/8 DIAMETER HOLES FOR STRUCTURAL FASTENERS THE VP ENGINEERS SEAL APPLIES ONLY' THIS DRAWING,INCLUDING THE INFORMATION HEREON,REMAINS THE PROPERTY OF <br /> MAY REQUIRED FOR HEAVY GAGE NESTED ZEE's AND/OR FASTENERSTO THE WORK PRODUCT OF VP AND VP BUILDINGS_IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED VP Buildings <br /> TO STRUCTURAL BEAMS DESIGN AND PERFORMANCE IN THE APPLICABLE PURCHASE ORDER AND SHALL NOT BE MODIFIED,REPRODUCED 3200 Players Club Circle Memphis TN 38125 ROOF COVERING PLAN <br /> 2.STEEL PANELS ARE AN INTEGRAL PART OF THE STRUCTURAL SYSTEM. REQUIREMENTS SPECIFIED BY VP.THE OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VP <br /> 8 REMOVAL OR ALTERATION WITHOUT PRIOR AUTHORIZATION IS.PROHIBITED. VP ENGINEER'S SEAL DOES NOT APPLY BUILDINGS REV DATE BY DESCRIPTION au'DER Commercial Design Consultants \ / 0815-022921-01 <br /> z 3.DUE TO MANUFACTURING LIMITATIONS SHORT PANELS MAY REQUIRE TO THE PERFORMANCE OR DESIGN OF THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE. 2/18f2016 DW vl FINAL'DRAWINGS °95j° Boeing Shared Services DATE <br /> o FIELD CUTTING,SEE THE COVERING SCHEDULE FOR CUT LENGTHS. ANY OTHER PRODUCT OR COMPONENT GOOD QUALITY WORKMANSHIP IN ERECTING:THIS BUILDING IN ACCORDANCE.WITH THIS- LOCATION - ,Jv///�� 2/18/2016 <br /> u Everett,.:WasMngton- ICDINGS <br /> a 4.SEE JOB DETAILS FOR COVERING AND TRIM FASTENER SPECIFICATION. FURNISHED BY VP EXCEPT TO ANY DRAWING,DETAILS REFERENCED IN THIS DRAWING,ALL APPLICABLE VP BUILDINGS P�EC WMMMMM DRAWN/CHECK <br /> 2 4.SEE'JOB DETAILS FOR COVERING AND TRIM FASTENER SPECIFICATION. DESIGN OR PERFORMANCE ERECTION GUIDES,AND INDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, Boeing Glycol Load/Unload Canopy DW `,CQP <br /> REQUIREMENTS SPECIFIED BY VP. INCLUDING THE CORRECT USE OF TEMPORARY BRACING. SULKERS POD ABC VERSIO^ 2C 5 2c PAGE <br /> NTS 15-1208 vPcvERsloa 20152c 18/ 1 4 <br /> FILENAME: C:1Vision'Building Files\15-022921-01\AS BUILD ACAD FILE\PIS Boeing Glycol Load and Unload Canopy_ROOF COVERING PLAN.dwg SAVE DATE i 2/25/2016 SAVEYIME:08:49:02. LAST SAVED BY: morgd - aarvmoa or BlaaSrope Baidmgs North Amen.In. <br />