Laserfiche WebLink
45-640 Trailer relocation <br /> The yard drawing shows the 45-01 paint hangar, the existing 45-02, and the proposed <br /> location of the 45-640 trailer. The 45-640 trailer is already on site East of the new 45- <br /> 011 Delivery Center. <br /> Per our conversation on June 5th during a meeting on this topic in the 40-11 it was <br /> requested that we provide a letter and drawing that explains the concept and clearances <br /> of the trailer relocation. <br /> The 45-01 paint hangar is shown with a 60' clear yard around it. The only apparent <br /> conflict is at the NW corner where there is some infringement of the 60' clear at the 45- <br /> 513 and 45-724 trailers. It is to be noted that this 60' is driven by a door pocket and not <br /> the main paint area. <br /> The proposal is to locate the 45-640 parallel to the 45-02 and at 31' from the 45-01. To <br /> the east the 45-640 is to be located approximately 13' 10" from the existing fence to the <br /> east The trailer is an office use with exits on east and west ends and both will have <br /> ADA ramps and stairs <br /> The existing 45-02 and the relocated trailer are to be considered as a single building <br /> due to the clearance between them. The drawing also shows a 60'wide yard <br /> encompassing both buildings. Note that there is shared yard space between the 45-01 <br /> and a small sharing of yard at the 45-011. <br />