My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1505 INDUSTRY ST Geotech Report 2018-01-02 MF Import
>
Address Records
>
INDUSTRY ST
>
1505
>
Geotech Report
>
1505 INDUSTRY ST Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 11:34:40 AM
Creation date
7/17/2019 8:21:58 AM
Metadata
Fields
Template:
Address Document
Street Name
INDUSTRY ST
Street Number
1505
Notes
SITE DEVELOPMENT
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r:sponsible for maintaining the integriry of the vapor barricr during construction. It may also be prudent <br /> to apply a scaler ro tlie slab to funher returd thc migration of moisture through the Flooc The strucwral <br /> engincer should bc consultcd for rceommendations 1br curing of wnaete slabs. <br /> PAVEM[NT SUBGRADE PREPARATION <br /> Nc recmnmcnd th�t thc subgrade soils in ncw pavcment arws bc prepured and evaluateJ as dcscribcd in <br /> Cic �arih�vork scction of this report. Thc upper 2 fect of all parking and acccss' drive pavcment subgradc <br /> ;ircas sl�ould be cumpactcd wiih a large ;teel drum roller to at Ieast 9+ perccnt �1llD per e\STN[ D 1557. <br /> Wc also rccammend lhat thc prepared subgrade be proofrolled thoroughly prior to paving to lacaic any <br /> solt or pumpiog soils. If the subgrade soils are loase or soft, i[may be necessary ro excav.�te the soils and <br /> replace them with stnictur:d fil1, gravcl borrow, or grevel t�ase materiaL Pavemcnt subgrade conditians <br /> I�uuld be observed and proof-rolled during constniction ro evaluate the presence of unsu;table subgrade <br /> �,il; and the necd f'ur ovcrexcavation and placement of a geotextilc fabric. �Ve rcconmiend that ihc <br /> ubgrade areas be preparcd ancl paved during the dry scason as�he glacial till soils will be very diffictdt ro <br /> ��nipac[and rou�c equipment un in the wet weathe.manths. <br /> I hc wnhactor should be prepared tu protcct acccss routes for cyuipmcnt with ATB or a ihick section ol' <br /> cn�shed gravcl or recycicd asphalt or concrcte during the �vinter. Tire subgradc soils will becomc <br /> dizturbed and hcavily nuted under equipmcnt loads in the winter if anprotected. <br /> DRAINAGE CONSIDERATIONS <br /> We anticipate shallow perched groundtvatcr secpage may cnter excava[ions depending on thc time of year <br /> construction lakes place,cspecially in the winter months. F(owever, ���c expect that this seepage water can <br /> bc handlcd by digging interccptor trenchcs in the cxcavations- and pumping from sumps. The scepaee <br /> watcr if not intcrrcptcct and removed from dic cxcavatiuns a�ill makc it difticult to placc and compact <br /> stnictural fill and may dcsr.ibilize cut slopcs. <br /> :�II p�rved and landscaped arcas should be gradec! so that surface drainage is direcred away from thc <br /> I building to appropriatc catch basins. <br /> Ruof duwnspouts should not discharge into the perCorateel pipes intended for providing wall drainage or <br /> iu li�c footing dmin lincs. <br /> '.;f'_COMMENDED ADDITIONAL GEOTECHNICAI SERVICES <br /> I�roughout this report, recommendations are provided �shere �cc consider additional geotechnical <br /> ;�ices to be appropriata These additional services:�re summarizcd below: <br /> • GcoEngi��cers should be retained to rcview the project plans and specitications wl.en comple!e to <br /> confin'n that our design recon:mcndations have becn impL.mentcd as intended. <br /> • During construction, GeoEngineers should observe tcmporary cut slopes, evaluate the suitability <br /> of thc fowidation and retaining�c�ll subgradcs', evaluatc thc suitability of tlour slab and pa��cmcnt <br /> subgradas, ob,erve installation oC subsurf'ace drainage mcasures, ob,erve and t��st structural <br /> backfill, ancl provide a summary Icttcr uf our conswction obscrvation scrvices. The purpuses oP <br /> Gco[:nginecrs construction phasc scrviccs arc to confimi that tL•c sub�urfacc condi�ions arc <br /> runsistent wiH� thuse anticiputed at Ihc sit� aml othcr rcu�on, describeJ in Appencix C, Repo�t <br /> I imitations anJ Guidclincs fur Use. <br /> l�l:. ,��„ ::��l:f-r,nl-wi __.___ —_—._—_�—A�' 1� CsEOENGINECl13�' <br /> hinuerc'<, 'i�ria <br />
The URL can be used to link to this page
Your browser does not support the video tag.