Laserfiche WebLink
r:sponsible for maintaining the integriry of the vapor barricr during construction. It may also be prudent <br /> to apply a scaler ro tlie slab to funher returd thc migration of moisture through the Flooc The strucwral <br /> engincer should bc consultcd for rceommendations 1br curing of wnaete slabs. <br /> PAVEM[NT SUBGRADE PREPARATION <br /> Nc recmnmcnd th�t thc subgrade soils in ncw pavcment arws bc prepured and evaluateJ as dcscribcd in <br /> Cic �arih�vork scction of this report. Thc upper 2 fect of all parking and acccss' drive pavcment subgradc <br /> ;ircas sl�ould be cumpactcd wiih a large ;teel drum roller to at Ieast 9+ perccnt �1llD per e\STN[ D 1557. <br /> Wc also rccammend lhat thc prepared subgrade be proofrolled thoroughly prior to paving to lacaic any <br /> solt or pumpiog soils. If the subgrade soils are loase or soft, i[may be necessary ro excav.�te the soils and <br /> replace them with stnictur:d fil1, gravcl borrow, or grevel t�ase materiaL Pavemcnt subgrade conditians <br /> I�uuld be observed and proof-rolled during constniction ro evaluate the presence of unsu;table subgrade <br /> �,il; and the necd f'ur ovcrexcavation and placement of a geotextilc fabric. �Ve rcconmiend that ihc <br /> ubgrade areas be preparcd ancl paved during the dry scason as�he glacial till soils will be very diffictdt ro <br /> ��nipac[and rou�c equipment un in the wet weathe.manths. <br /> I hc wnhactor should be prepared tu protcct acccss routes for cyuipmcnt with ATB or a ihick section ol' <br /> cn�shed gravcl or recycicd asphalt or concrcte during the �vinter. Tire subgradc soils will becomc <br /> dizturbed and hcavily nuted under equipmcnt loads in the winter if anprotected. <br /> DRAINAGE CONSIDERATIONS <br /> We anticipate shallow perched groundtvatcr secpage may cnter excava[ions depending on thc time of year <br /> construction lakes place,cspecially in the winter months. F(owever, ���c expect that this seepage water can <br /> bc handlcd by digging interccptor trenchcs in the cxcavations- and pumping from sumps. The scepaee <br /> watcr if not intcrrcptcct and removed from dic cxcavatiuns a�ill makc it difticult to placc and compact <br /> stnictural fill and may dcsr.ibilize cut slopcs. <br /> :�II p�rved and landscaped arcas should be gradec! so that surface drainage is direcred away from thc <br /> I building to appropriatc catch basins. <br /> Ruof duwnspouts should not discharge into the perCorateel pipes intended for providing wall drainage or <br /> iu li�c footing dmin lincs. <br /> '.;f'_COMMENDED ADDITIONAL GEOTECHNICAI SERVICES <br /> I�roughout this report, recommendations are provided �shere �cc consider additional geotechnical <br /> ;�ices to be appropriata These additional services:�re summarizcd below: <br /> • GcoEngi��cers should be retained to rcview the project plans and specitications wl.en comple!e to <br /> confin'n that our design recon:mcndations have becn impL.mentcd as intended. <br /> • During construction, GeoEngineers should observe tcmporary cut slopes, evaluate the suitability <br /> of thc fowidation and retaining�c�ll subgradcs', evaluatc thc suitability of tlour slab and pa��cmcnt <br /> subgradas, ob,erve installation oC subsurf'ace drainage mcasures, ob,erve and t��st structural <br /> backfill, ancl provide a summary Icttcr uf our conswction obscrvation scrvices. The purpuses oP <br /> Gco[:nginecrs construction phasc scrviccs arc to confimi that tL•c sub�urfacc condi�ions arc <br /> runsistent wiH� thuse anticiputed at Ihc sit� aml othcr rcu�on, describeJ in Appencix C, Repo�t <br /> I imitations anJ Guidclincs fur Use. <br /> l�l:. ,��„ ::��l:f-r,nl-wi __.___ —_—._—_�—A�' 1� CsEOENGINECl13�' <br /> hinuerc'<, 'i�ria <br />