My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1505 INDUSTRY ST Geotech Report 2018-01-02 MF Import
>
Address Records
>
INDUSTRY ST
>
1505
>
Geotech Report
>
1505 INDUSTRY ST Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 11:34:40 AM
Creation date
7/17/2019 8:21:58 AM
Metadata
Fields
Template:
Address Document
Street Name
INDUSTRY ST
Street Number
1505
Notes
SITE DEVELOPMENT
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo���., <br /> `Engineers <br /> ��pril 13, '1002 <br /> Rinker Matcrials <br /> P.O. Box 2037 <br /> Gverctt, R';.::�ington 98203 <br /> Attentian: Warren FIawF�idge <br /> Revised Summary Lctter <br /> Earthwork Ivfonitoring Serviccs <br /> Seaway Ccnler, Lot$ <br /> Everctt, Washingtan <br /> File No. 6l)2-00]-03 <br /> INTRODUCTION <br /> This lettcr prescnts a summary of our earthwork observation aad testing scrvices during <br /> !*rading on Lot 8 of the Seaway Center(lhe site) in Everett, Washington. The original summary <br /> Ictter was issued on A4arch l4, 2402 and this rcviscd letter providrs more infoanation and <br /> claritication regarding seepage from the FSA De[ention Pond. The site consists of approximately <br /> S7 acres and is located on the southeast comer of the intersection ot Ivferrill Creek Parlavay and <br /> Eiardeson lioad in south L'verett. Lot 8 is bounded by Menill Creek pariavay [o the noRh, <br /> I I:irdcson Road lo the wesi, King Extrusians to the south, and by Rinker M1taterials Phase Two, <br /> Lots S, 9, ar,d 10 to the east. The sou[h cnd (approximately 300 feet) of t!�c e�st property line is <br /> also bordered by t6e Food Services of America property. Our services Cor this projcct were <br /> completcd in general accordance with uur Master Services A,,rreement with Rinker Maicrials. <br /> Earthwork a! the site was perfo�mcd in gcncral accordance with the Letter of Understanding <br /> behvicen Rinker Materials and Washington Federal Savings, dated bfay 21, 2001. The Letter of <br /> Understandins summarized the genera earthwor.l• requirements for mass grading. The letter was <br /> developed aRer the bfay 1 !, 2001 meeting ihat was a[tended by representatives from Ihc Seaway <br /> '` �eliq�;^cn' Cnr.:i�;�nv. 1Vashinrton Peder�l Savings, Rinker bfaterials, GeoEn�incers, and KLB <br /> .i.;G,i r:un. <br /> EARTHWORK 085ERVATIONS <br /> ��� ;im�. �.; �l�,c ;itc ��,�-,,,n ��� 'hc summer oF2000 and ended in the fall of 2001. Grading in the <br /> summcr ol Z000 primarily invalved cu�ting on the eastem side of the site and using the soil as fill <br /> on the adjacent Rinker i'�tatr.i�als Lots 9, l0 and 1 I ro fill in previausly mined pit aroas. Rinker <br /> Matcnals mined sand and gravel along the eastem edge o£the site and on Rinker Muterials Lot 8 <br /> in Ihe summcr of 20D0 mid continued minin�; until die spring oC200 f. <br /> ;;:�,Engii,ccn.Ini. <br /> 1�i IU IShlll dccnuc R.E <br /> ���:�._dntnnd.1V,193�5' <br /> �G:�cphonc(435)?b�1dn;0 <br /> f:��(4?i)8GI(�IISU <br /> �c��•,e 6mu.�ngin�rn.cnm <br />
The URL can be used to link to this page
Your browser does not support the video tag.