My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INTERWEST CONSTRUCTION INC. 7/9/2019 Change Order 13
>
Contracts
>
Capital Contract
>
INTERWEST CONSTRUCTION INC. 7/9/2019 Change Order 13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:26:29 AM
Creation date
7/17/2019 10:26:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
INTERWEST CONSTRUCTION INC.
Approval Date
7/9/2019
Department
Public Works
Department Project Manager
HEATHER GRIFFIN
Subject / Project Title
GRAND AVENUE PARK BRIDGE
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
13
Tracking Number
0000801
Total Compensation
$23,516.05
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Interwest Construction Inc. <br /> Job Name: Everett Grand Ave Bridge Job Code: 1157 <br /> Cost Code Review <br /> Cost Code: 9107 Redesign of support for pipe on brid FA <br /> Code Description Class Reg.Hours OT Hours Other Hours <br /> Date: 04/30/2019 Foreman: ANDENICJ Shift: 1 <br /> Time Card: <br /> Production Quantities: 0.000 <br /> GUSTERIA Eric A Gustin CJ 2.00 / 0.00 0.00 <br /> SANCEDGG Edgar G Sanchez CJ 2.00, 0.00 0.00 <br /> Labor Totals: Hours - 4.0 <br /> Equip Totals: Hours - 0.0 <br /> Date: 05/14/2019 Foreman: ANDENICJ Shift: 1 <br /> Time Card: <br /> Production Quantities: 0.000 <br /> ANDENICJ Nicholas J Anderson CS 2.00 ' 0.00 0.00 <br /> 08-70 Chev 3/4 Ton 4x4 2.00 0.00 0.00 <br /> GUSTERIA Eric A Gustin CJ 8.00- 0.00 0.00 <br /> SANCEDGG Edgar G Sanchez CJ 8.00' 0.00 0.00 <br /> Labor Totals: Hours - 18.0 <br /> Equip Totals: Hours - 2.0 <br /> Cost Code Notes: <br /> Slot: 5 <br /> Company Note: Worked on raising pipe and fit up for welding tomorrow. <br /> Indexes: <br /> Inspector Note: <br /> Printed on: 06/12/2019 12:30:15 <br /> x Date: <br /> Attendance/Non-Use Codes included in Hours:None/None Paae 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.