My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INTERWEST CONSTRUCTION INC. 7/9/2019 Change Order 13
>
Contracts
>
Capital Contract
>
INTERWEST CONSTRUCTION INC. 7/9/2019 Change Order 13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:26:29 AM
Creation date
7/17/2019 10:26:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
INTERWEST CONSTRUCTION INC.
Approval Date
7/9/2019
Department
Public Works
Department Project Manager
HEATHER GRIFFIN
Subject / Project Title
GRAND AVENUE PARK BRIDGE
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
13
Tracking Number
0000801
Total Compensation
$23,516.05
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Grand Avenue Park Bridge <br /> Change Order No.: 13 <br /> Change Order Effective Date: 06-17-2019 <br /> CONTRACTOR <br /> By a-- 0/.€. <br /> Officer Date: 6 7/5 // 9 <br /> Exhibit A—Description of Changed Work <br /> Shim 30"CS and 36"SD Steel Pipes at West End of Bridge —Per RF1 270, it was discovered that the <br /> 30" CS and 36" SD Flex Couplings at the west end of the bridge, between L1 and L2, were in conflict <br /> with the W8x18 beams that run beneath the pipes. The solution was to add steel shims beneath the <br /> respective pipes to elevate them to avoid the conflict. Portions of the W8x18 top flanges beneath the <br /> 36" SD pipe were removed as well in order to minimize the amount of shimming required. <br /> Exhibit B—Additional Contract Time: <br /> This change order adds 0 (zero) working days to the contract. <br /> Exhibit C—Existing and New Bid Item(s) <br /> See attached for new bid item. <br /> Submittals <br /> Submit certificate of material origins for galvanized steel shims and threaded bolts. <br /> Measurement and Payment <br /> Cost shall be per lump sum and include all labor, materials, equipment necessary to install the new <br /> galvanized steel shims beneath the 30"CS and 36"SD steel pipes. <br /> ATTACHMENTS(11 Additional Pages) <br /> • Exhibit C- New Bid Item <br /> • Interwest Construction Time and Material Cost Backup <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.