Laserfiche WebLink
Project: Grand Avenue Park Bridge <br /> Change Order No.: 13 <br /> Change Order Effective Date: 06-17-2019 <br /> CONTRACTOR <br /> By a-- 0/.€. <br /> Officer Date: 6 7/5 // 9 <br /> Exhibit A—Description of Changed Work <br /> Shim 30"CS and 36"SD Steel Pipes at West End of Bridge —Per RF1 270, it was discovered that the <br /> 30" CS and 36" SD Flex Couplings at the west end of the bridge, between L1 and L2, were in conflict <br /> with the W8x18 beams that run beneath the pipes. The solution was to add steel shims beneath the <br /> respective pipes to elevate them to avoid the conflict. Portions of the W8x18 top flanges beneath the <br /> 36" SD pipe were removed as well in order to minimize the amount of shimming required. <br /> Exhibit B—Additional Contract Time: <br /> This change order adds 0 (zero) working days to the contract. <br /> Exhibit C—Existing and New Bid Item(s) <br /> See attached for new bid item. <br /> Submittals <br /> Submit certificate of material origins for galvanized steel shims and threaded bolts. <br /> Measurement and Payment <br /> Cost shall be per lump sum and include all labor, materials, equipment necessary to install the new <br /> galvanized steel shims beneath the 30"CS and 36"SD steel pipes. <br /> ATTACHMENTS(11 Additional Pages) <br /> • Exhibit C- New Bid Item <br /> • Interwest Construction Time and Material Cost Backup <br /> Page 3 of 3 <br />