My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alternative Environmental Technologies 7/9/2019
>
Contracts
>
6 Years Then Destroy
>
2019
>
Alternative Environmental Technologies 7/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2019 11:21:42 AM
Creation date
7/18/2019 11:21:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alternative Environmental Technologies
Approval Date
7/9/2019
End Date
10/31/2019
Department
Facilities
Department Project Manager
Chris Lark
Subject / Project Title
South Precinct Roof Hazardous Materials
Tracking Number
0001892
Total Compensation
$5,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> SCOPE OF WORK <br /> The purpose of this contract is a hazardous materials assessment for the South Precinct Roof located at <br /> 1121 SE Everett Mall Way. <br /> Scope of Work <br /> The work shall include the required Asbestos Good Faith Inspection (AGFI), including random lead paint <br /> sampling of the steel structure that support the equipment fence so that hazardous materials: asbestos <br /> and lead, can be identified for worker protection during any work activity that may disturb these <br /> materials. A breakdown of the scope of work is as follows: <br /> 1. Good Faith Inspection (AGFI) & Hazmat Verification <br /> 2. Lead Paint Chip Survey <br /> Assessment Deliverables <br /> The following items shall be delivered to the City of Everett at the completion of the assessments: <br /> 1. AGFI—1 hard copy per building in separate 3 ring binder <br /> 2. AGFI—Electronic Copy—PDF version <br /> 3. Lead Paint Chip Survey—include results with AGFI per building <br /> Staff <br /> Alternative Environmental Technologies shall execute the work with the staff as follows: <br /> 1. Brian Hunt MA RA-AHERA Building Inspector <br /> 2. Dave Leonard MSPH CIH—Technical Resource Expert <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.