Laserfiche WebLink
"I <br />ie <br />INSPECTION REPORT <br />4101 <br />Address cl��tM4yo iF <br />Contractor ✓� �� <br />Owner / An <br />Date z—Zcl—k <br />-YPE OF INSPECTION REQUESTED <br />�Cf`fa E <br />BLDG: Pmt. No. �❑ MECH: Pmt. No. _ <br />❑ ELEC: Pmt. No. <br />❑ Temp. Elect. <br />❑ Footing <br />0 Foundation <br />❑ Ductwork <br />❑ Wood Stove <br />❑ Masonry <br />❑ PLBG: Pmt. No. <br />i)(Framing <br />❑ Drywall, Nailing <br />❑ Shear Nailing <br />❑ GrIC <br />❑ Rough -In <br />❑ Service <br />❑ Gas Piping <br />❑ Consultation <br />❑ Groundwork <br />❑ Struct. Slab <br />❑ Final <br />❑ — <br />❑ APPROVAL X PARTIAL APPROVAL <br />❑ VIOLATION CORRECTION REQUIRED <br />❑ Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />❑ Was not able to perform inspection. <br />❑ CALL 259-8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND PCSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />W A <br />Inspector Dale ? -z � �R8 _ <br />