My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
>
Contracts
>
Capital Contract
>
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:01 AM
Creation date
7/19/2019 8:54:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
FABER CONSTRUCTION CORPORATION
Approval Date
7/15/2019
Department
Facilities
Department Project Manager
RUBEN SANCHEZ
Subject / Project Title
EVERGREEN BRANCH LIBRARY EXPANSION
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0001602
Total Compensation
$222,919.64
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 1/10/2019
(Amendment)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Evergreen Branch Library Expansion <br /> Change Order No. 2 - Evergreen Branch Library Expansion Exhibit A <br /> No. <br /> Construction Change Directives Amount <br /> 1 Demo Return Fan RF-2 not indicated demo plans $ 959.46 CO 1 <br /> 2 Material Credit For FCU-16, intended to be provided in future $ (1,900.00) CO 2 <br /> 3 Reestablish power to monument sign at Holly Dr. entrance $ 10,702.77 CO 11 <br /> 4 Provide stainless steel sink at Children's Reading Room $ 5,538.50 CO 14 <br /> 5 Provide Security &Access Management Controls Systems $ 57,797.59 CO 17 <br /> No. <br /> Faber Construction, Corp. Change Proposals Amount <br /> 1 Demo existing outdoor Unit CU-2 to allow proper install for new CU-5 $ 1,168.89 CO 3 <br /> 2 Provide ERV Monitoring, monitoring of control dampers & shut downs $ 3,544.64 CO 4 <br /> 3 Provide & Install new 20A-3P curcuit & 3 Pole Breaker for Partition curtain $ 2,723.33 CO 6 <br /> 4 Additional ductwork at ERV 1-3 Intake & Exhaust not on mech. Plans $ 5,423.21 CO 7 <br /> 5 Credit per RFI 57, revise length of Fl 1 fixture to (2) 48" $ (350.00) CO 8 <br /> 6 Provide & Install additional F7 light fixtures $ 6,187.30 CO 9 <br /> 7 Provide & Install additional F3 light fixtures for book drop and closet $ 3,081.67 CO 10 <br /> 8 Incorporate modifications & additions to fire sprinkler supply system $ 12,874.07 CO 12 <br /> 9 Remove & replace attic insulation issued by Authority Having Justisdiction $ 49,744.52 CO 13 <br /> 10 Supply and install DMF remodel can lights at exterior soffits locations $ 5,397.93 CO 15 <br /> 11 Underslab Electrical-existing walker-duct unusable. Add'l conduit runs required $ 60,025.76 CO 16 <br /> Total: $ 222,919.64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.