Laserfiche WebLink
Work Activity Work Order Page 2 <br /> 7/11/2019 10:56 <br /> Issued By BRP BIGLEY,RYAN P. <br /> Issued Department PIN PUBLIC WORKS <br /> Date Issued 5/8/2019 <br /> Fund 401 Account 5 Program Function Activity <br /> Program UT3473 18 3 <br /> Title CONVERT,75 INCH 114 BARBARA LN UT3473-18-3 <br /> Work Order No 20191373 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 5/8/2019 Time 08:47 Original WO Billing <br /> P <br /> Problem Details <br /> CONVERT.75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND <br /> BOX. FLAT TO METER PROGRAM. <br /> Structure ID StrTvp Activity Compl Date Comments <br /> WS1284S047 WASRVC YES 6/20/2019 <br /> Address 114 BARBARA LN <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 114 BARBARA LANE <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date Ware <br /> M ADAP34000547 ADAPTER 3/4 MIP X 3/4 IPS INSTA-TITE 1 15.361 06/21/2019 PAN <br /> M BOX000154347 BOX METER MOLDED PLASTIC W/DI LID 11"X 18" (SMALL) 1 74.813 06/21/2019 PAN <br /> M METE34141847 METER 5/8 X 3/4 NEPTUNE W/E-CODER R900I CU FT STUB ANTENNA 1 205.897 06/21/2019 PAN <br /> M NIPP34131247 NIPPLE 3/4 NPT X CLOSE BRASS 1 1.367 06/21/2019 PAN <br /> M SETT34146547 SETTER COPPER 5/8 X 3/4 HEIGHT 9"NO LEG LENGTH HI/HO 1 113.126 06/21/2019 PAN <br /> Total Material Cost $410 <br />