Laserfiche WebLink
Work Activity Work Order Page 2 <br /> 7/11/2019 11:05 <br /> Issued By BRP BIGLEY,RYAN P. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 5/31/2019 <br /> Fund 401 Account 5 Program Function Activity <br /> Program UT3473 18 3 <br /> Title CONVERT.75 INCH 124 BARBARA LN UT3473-18-3 <br /> Work Order No 20191506 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 5/31/2019 Time 06:50 Original WO Billing <br /> Problem Details <br /> CONVERT.75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND <br /> BOX. FLAT TO METER PROGRAM. <br /> Structure ID StrTvp Activity Compi Date Comments <br /> WS1284S063 WASRVC YES 6/20/2019 <br /> Address 124 BARBARA LN <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 124 BEVERLY LANE <br /> Location <br />