My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 7399
>
Resolutions
>
Resolution 7399
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2019 11:50:58 AM
Creation date
7/22/2019 11:50:32 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
7399
Date
7/17/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plan Section 1 <br /> Implementation <br /> Several steps are necessary to successfully implement the Section 1 trail linking Howarth <br /> Park with Pigeon Creek No. 1. Feasibility of the construction of an all-weather trail will be <br /> determined based on current best available data. The narrow area for trail construction may <br /> necessitate that it be built on pilings and some portions may have to be built in the railroad <br /> right-of-way. Inwater work (waterward of the Ordinary High Water Mark) faces stringent <br /> permitting conditions unless it is clear that the ecology will benefit and the use is appropriate. <br /> Another key step will be to acquire property or easement rights for those tidelands in private <br /> ownership. Support and permission from the railroad is essential to creation of this trail <br /> section along the waterfront. During construction, environmental clean-up of contaminated <br /> sediments and beach restoration could be accomplished. <br /> Shoreline Public Access Plan Update 2019 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.