Laserfiche WebLink
Plan Section 2 <br /> Description of Improvements and Details <br /> 2.1 Overpass or Underpass at Pigeon Creek No. 1 <br /> Future improvements in this area could include interpretive signs, restrooms, and <br /> additional park improvements, such as benches. Designs for the proposed public access <br /> at Meadowdale Beach Park should be evaluated for applicability to an undercrossing at <br /> Pigeon Creek. The drawing below illustrates an undercrossing of the railroad tracks to <br /> reach the beach at the end of the service road that parallels Pigeon Creek No. 1. <br /> e/77evar=26.,1!5,C7 AML. <br /> 4444,01,2 sr�6- <br /> ` t vn sig - -:4 s <br /> �✓e,�q� Ww/cnw rD „fr.,/ x uo v <br /> 4iEG7"-2InSf Atom <br /> 2.2 Trail Along South Pigeon Creek No. 1 to Terminal Ave., As a <br /> condition of approval of a shoreline substantial development permit for its Marine <br /> Terminal Improvements at the Port's Hewitt Terminal facility, the Port <br /> constructed a paved walkway running along the east side of the property to an upland area <br /> adjacent to Pigeon Creek No. 1 with beach access and a picnic area and viewpoint. <br /> 2.3 Terminal Avenue to Everett Avenue Connection— <br /> The 25th Street ped/bike overcrossing at W. Marine View Dr. is now complete. It connects <br /> Terminal Avenue with an overcrossing of the railroad tracks to Everett Avenue and the <br /> downtown. <br /> Shoreline Public Access Plan Update 2019 12 <br />