Laserfiche WebLink
Shoreline Section Status Participants Cost 1 2 3 Notes <br /> 4.9 Bridge Entry to former City,BNSF $$ Possible future trail when property redeveloped <br /> Weyerhaeuser site <br /> 4.10 SR 529 Bike/Ped improve City,Others $$$ x Possible future trail when property redeveloped <br /> crossing $ <br /> 5.1 Riverside Business Park Trail design City,Port, $$ X Waterfront trail construction in 2019 <br /> completed Others <br /> 5.2 Port Access Bridge to City,Port, $ X Throw fence over RR track completed <br /> Riverside Business Park BNSF Aug.2018 <br /> 5.3 West Channel City,Port $$ X Construct trail along shoreline <br /> 5.4 Trail Around Wetland City $ X Construct foot access to viewpoint on western <br /> margin of City property without adverse impact <br /> to valuable wetland <br /> 5.5 Pinch Point City,BNSF $$$ X <br /> 5.6 Bridge to Langus City,Others $$$ X <br /> Park $ <br /> 6.2 23rd Street City,Others $$$ x Include ped/bike area if overpass constructed for <br /> Connection redevelopment <br /> 6.3 Everett Avenue City,Others $$$ X <br /> Connection <br /> 6.4 Street-End Viewpoint City $ X <br /> 6.5 Riverpoint to Bridge City $ X <br /> 6.6 Highway 2 to Everett Station Phase I City $ X Widened sidewalk along Pacific Ave.to connect <br /> completed with Everett Station <br /> 7.1 Trail at Eclipse Mill;new Park designed City,Others $$ Eclipse Mill Park named and under design <br /> riverfront park <br /> 7.2 36th Street Connection Completed City,BNSF $$ <br /> 7.3 Lowell Riverfront Trail Completed City X <br /> 7.4 Connection to Completed City,Others $$$ X <br /> Interurban Trail <br /> 7.5 Lenora St.Overcrossing City,Others $$ X Only if bypass is constructed <br /> 8.1 Rotary Park Exit Completed City $ X Bike/ped trail beside parking access road <br /> 8.2 Lowell River Road Preliminary City,Others $$ X x Working with Snohomish County to design <br /> discussions bike trail to connect to Snohomish <br /> 9.2 Tidal restoration on Smith Island Completed City,Corps Setback dike raised to 15 ft.for City's Water <br /> Pollution Control Facility with 4,000 ft.ped trail <br /> extension along Union Slough <br /> 9.3 Smith Island Enhancements Completed City,Corps Trail extension north of Langus Riverfront Park o�n <br /> top of dike;public shoreline access loop from 12 <br /> St to south tip of island connecting to bridge to <br /> Spencer Island at 4th St. <br /> 10 SR 527 Expansion Completed City,Others Additional 9,780 ft.of bike lane and sidewalk;picnic <br /> table and hand carry boat access on east bank of <br /> Silver Lake <br /> Shoreline Public Access Plan Update 2019 3 <br />