My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3901 HOYT AVE EVERETT CLINIC PATHOLOGY LAB 2018-01-02 MF Import
>
Address Records
>
HOYT AVE
>
3901
>
EVERETT CLINIC PATHOLOGY LAB
>
3901 HOYT AVE EVERETT CLINIC PATHOLOGY LAB 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2022 7:30:58 AM
Creation date
7/23/2019 8:42:55 AM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
3901
Tenant Name
EVERETT CLINIC PATHOLOGY LAB
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2004 Washinqton Slate Nonresidential Energy Code CL,mpliance Form <br />Hays" May 2005 <br />Project Info <br />Project Address Everett Clinic, Pathology Lan <br />Date B/30/2007 <br />Founders auildi ng Lover <br />For Building Dept. Use <br />3901 Hoyt Ave, Everett HA 90201 <br />Applicant Name: Eddie Shahan <br />Applicant Address: PSF Math— 9322 14th Ave S, Seattle, VA 90108 <br />Applicant Phone: 206 812 3594 <br />ject Description <br />y describe mechanical <br />in type and features. <br />Q Includes Plans Drawings must contain notes requireing compliance won commissioning requirements - Section 1416 <br />QQ Simple System O Complex System O Systems Analysis <br />ComplianLe Option (See Decision Flowchart (over) for qualifications. Use seperate MECH-SUM for simple & complex systems.) <br />Equipment Schedules <br />The following information is required to be incorporated with the mechanical equipment schedules on the <br />plans. For projects without plans, fill in the required informati3n below. <br />Coolin Equipment Schedule <br />Equip. <br />ID <br />Brand Name' <br />Model No.' <br />Capacity 2 <br />Btu/h <br />Total CFM <br />OSA CFM <br />or Econo7 <br />SEER <br />or EER <br />IPLV1 <br />Location <br />SEE SHEET M0.2 <br />Heating Equipment Schedule _ <br />Equip. <br />ID <br />Brand Name' <br />Model No.' <br />Capacity' <br />Btu/h <br />Total CFM <br />OSA cfm <br />or Econo7 <br />Input Btuh <br />Output Bluth <br />Efficient ° <br />Fan Equipment Schedule <br />Equip. <br />ID <br />Brand Name <br />Model No <br />CFM <br />Sp' <br />HP/BHP <br />Flow Controls <br />Location of Service <br />SEE SHEET M0.2 <br />'If available. 'As tested according to Table 14-IA through 14-1 O. 3 If required. 4 COP, HSPF, Combustion Efficiency, or AFUE, as <br />applicable. S Flow control types: variable air volume(VAW constant volume (CV), or variable speed (VS). <br />-lot <br />
The URL can be used to link to this page
Your browser does not support the video tag.