My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering Inc 7/9/2019
>
Contracts
>
6 Years Then Destroy
>
2021
>
HDR Engineering Inc 7/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 9:48:05 AM
Creation date
7/23/2019 9:47:45 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering Inc
Approval Date
7/9/2019
Council Approval Date
7/3/2019
End Date
6/30/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Update Comprehensive Water Plan
Public Works WO Number
UP3718
Tracking Number
0001899
Total Compensation
$760,233.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. For all sums which the insured becomes legally C. When coverage for liability arising out of the <br /> obligated to pay as damages caused by "occur- "products-completed operations hazard" is pro- <br /> rences" under Section I —Coverage A, and for all vided, any payments for damages because of <br /> medical expenses caused by accidents under "bodily injury" or "property damage" included in <br /> Section I — Coverage C, which cannot be at- the "products-completed operations hazard" will <br /> tributed only to ongoing operations at a single reduce the Products-completed Operations Ag- <br /> designated construction project shown in the gregate Limit, and not reduce the General Ag- <br /> Schedule above: gregate Limit nor the Designated Construction <br /> 1. Any payments made under Coverage A for Project General Aggregate Limit. <br /> damages or under Coverage C for medical D. If the applicable designated construction project <br /> expenses shall reduce the amount available has been abandoned, delayed, or abandoned <br /> under the General Aggregate Limit or the and then restarted, or if the authorized contract- <br /> Products-completed Operations Aggregate ing parties deviate from plans, blueprints, de- <br /> Limit, whichever is applicable; and signs, specifications or timetables, the project will <br /> 2. Such payments shall not reduce any Desig still be deemed to be the same construction pro- <br /> nated Construction Project General Aggre- <br /> ject. <br /> gate Limit. E. The provisions of Section III — Limits Of Insur- <br /> ance not otherwise modified by this endorsement <br /> shall continue to apply as stipulated. <br /> Page 2 of 2 © Insurance Services Office, Inc., 2008 CG 25 03 05 09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.