My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1304 MARYLAND AVE 2019-07-24
>
Address Records
>
MARYLAND AVE
>
1304
>
1304 MARYLAND AVE 2019-07-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 9:49:54 AM
Creation date
7/24/2019 9:49:52 AM
Metadata
Fields
Template:
Address Document
Street Name
MARYLAND AVE
Street Number
1304
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WAC 296-46B-9900.•:ELECTRICAL.PLAN REVIEW' <br /> DIRECTIONS: Read the WAC section below to determine if plan review is required or not required.Then select the box next to (a)to <br /> tell City Staff if plan review is not requried and select the box next to the specific reason from WAC 296-46B-900. If plan review is <br /> required, select the box next to(b)and (c)to acknowledge that plan review is required and the electrical plans have been provided <br /> with this permit application. <br /> * If item (a)-(ii,iii,or v) is selected,the work must also comply with section (a)-(vii).See arrow flow chart below. <br /> (3) Electrical plan review. <br /> ® (a) Electrical plan review is not required for: <br /> ❑ (i) Low voltage systems; <br /> ®--❑ (ii) Lighting specific projects that result in an electrical load reduction on each feeder involved in the project; <br /> ❑ (iii) Heating and cooling specific retrofit projects that result in an electrical load reduction on each existing feeder <br /> involved in the project, provided there is not a corresponding increase in the available fault current in any feeder. <br /> (iv) Stand-alone utility fed services that do not exceed 250 volts,400 amperes where the project's distribution system <br /> o does not include: <br /> (A) Emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (B)An essential electrical system defined in NEC 517.2;or <br /> (C)A required fire pump system. <br /> ❑ (v) Modifications to existing electrical installations where all of the following conditions are met: <br /> (A)Service or distribution equipment involved is rated not more than 400 amperes and does not exceed <br /> 250 volts or for lighting circuits not exceeding 277 volts to ground; <br /> (B) Does not involve emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (C) Does not involve branch circuits or feeders of an essential electrical system as defined in NEC 517.2; <br /> and <br /> (D) Service or feeder load calculations are increased by 5% or less. <br /> (vi) Electric power production source(s)such as solar photovoltaic,fuel cell, or wind electric system(s)with a total <br /> ❑ rating of 9600 watts or less. <br /> (vii) For installations in (a)(ii),(iii),and(v)of this subsection to be considered,the following must be available <br /> ❑ to the electrical inspector before the work is initiated: <br /> (A)A clear and adequate description of the project's scope; <br /> (B)A load calculation(s); <br /> (C)What the load changes are, providing both before and after panel schedules as needed; and <br /> (D) Provide information showing that the service and feeder(s)supplying the panel(s)where the work is <br /> taking place has adequate capacity for any increased load and has code compliant overcurrent protection <br /> for that supply. <br /> NOTE: Electrical plan review is not required for"Medical, dental, and chiropractic clinic"of which is a clinic or <br /> O physicians'office where patients are not regularly kept as bed patients for twenty-four hours or more, per section <br /> (1)(c)(xii). <br /> ® (b) Electrical plan review is required for all other new or altered electrical projects in educational, institutional, or health care <br /> occupancies defined in this chapter. <br /> ® (c) If a review is required,the electrical plan must be submitted for review and approval before the electrical work is begun. <br /> T lile-pod-t Table-90('!-2 <br /> tie#Ithier Perla iai Care Facilities Educational-arnd,lnstit itional;Facilhtres,Flaces of/sseiinbiy.or Other iFOOiltties.. <br /> Health or Personal Care-Facility Plan.Review <br /> Type Required Educational Institutional,or Plan Review: <br /> Hospita6 Yes Other Facility Types:. Required <br /> P9uis c a he ne' itc or Ibtig=fermi e's =tki eatianal Yes: <br /> care nr{t €natitutio a.E Yes <br /> Boarding home ','es <br /> 6SStStectli,iffng,facifitY Yzs <br /> Private a cohoiisrn hospital Yes ixlote to':Fables 4o£f-�aiiiE 9Ci0< . <br /> aei+.at. gsjc ^airictsasp€ial <br /> YEft Crt3 3Ltt f i3 ed t a da ete[frrCal<in=p ttati <br /> Maternity hone Yesrna}r requitr'plan r.a iiew,on faciiitytype riot <br /> . rnb iie ory surgeryraciiiti Yes previewed:b}t?tedepailment. <br /> Renal is stclinic Yes <br /> Ad <br /> es� ent=a m l tre tre tri:1erttfac(4i'ty YR5 <br /> Enhanced service faality Yes, <br /> rY ultesiciantia!-rehaliilitatiore Yes PERMIT# Page 2-Plan Review <br /> conte;: - . <br />
The URL can be used to link to this page
Your browser does not support the video tag.