Laserfiche WebLink
04 INDEX OF DRAWINGS-ARCHITECTURE- CONT. 04 INDEX O� DRAWINGS -INTERIORS 17 1NDEX OF DRAW WGS-FOOD SERVICE ° <br /> SHEET NO. DRAWING TITLE SHEET 15SUE DATE SHEE7 NO. DRAWING TITLE SHEET ISSUE DATE SHEET NO. DRAWING TITLE SHEET ISSUE DATE <br /> A500-A529 - DETAILS AF10-AF59- PARTIAL FINISH FLOOR PLAN FS1A3 OVERALL FOOD SERVICE PLAN 04/21/15 � <br /> A500 DETAILS 06/16/15 1AF10-12 PARTIAL FINISH FLOOR PLAN 10/20/15 FS1A370 ELEVATIONS AND DETAILS 04/21/15 <br /> A501 DETAILS 06/30/15 1AF10-17 PARTIAL FINISH FLOOR PLAN 10/20l15 FS1A371 ELEVATIONS AND DETAILS 04/21/15 <br /> A502 DETAILS 04/21/15 1AF10-22 i'ARTIAL FiNISH FLOOR PLAN 10i20115 FS1A372 ELEVATIONS AND DETAILS 04/21/15 <br /> A503 DETAILS Q4/21/15 1AF10-47 PARITAL FINISH FLOOR PLAN 05/19/15 FS1A451 SERVERY EQUIPMENT PLAN 04/21/15 <br /> A504 DETAILS 09/08/15 1AF10-57 PARTIAL FINISH FLOOR PLAN 05/19/15 FS'1A452 KITCHEN EQUIPMENT PLAN 04/21/15 <br /> A505 DETAILS 12/05/14 L10-L59- PARTIAL LAYOUT FLOOR PLAN FS1A453 SELF-SERVE EQUIPMENT PLAN 04/21/15 <br /> A506 DETAILS 05/19/15 1L10-12 PARTIAL LAYOUT FLOOR PLAN 10/20/15 FS1A454 ELECTRICAL ROUGH-►NS PLAN 04/21/15 <br /> A507 DETAILS 07/28/15 1L10-17 PARTIAL LAYOUT FLOOR PLAN 10/20/15 FS1A455 ELECTRICAL ROUGH-INS PLAN 04l21/15 <br /> A508 DETAILS 09/Q�/15 1L10-22 PARTIAL LAYOUT FLOOR PLAN 10/20/15 FS1A456 ELECTRICAL ROUGH-INS PLAN 04/21/15 = <br /> A509 DETAILS 10/30/14 1L10-27 PARTIAL LAYOUT FLOOR PLAN 10/20/15 FS1A457 PLUMBING ROUGH-INS F'LAN 04/21/15 <br /> A510 DETAILS 06/16/15 1L10-32 PARTIAL LAYOUT FLOOR PLAN 10/20/15 FS1A458 PLUMBING ROUGH-INS PLAN 04/21/15 <br /> A511 DETAILS 06/16/15 1L10-37 PARTIAL LAYOUT FLOOR F'LAN 10/20/15 �S1A459 PLUMBING ROUGH-INS PLAN 04/21/15 <br /> A512 DETAILS 10/30/14 1L10-42 PARTIAL LAYOUT FLOOR PLAN 10/20/15 FS1A460 BUILDING WORKS PLAN 04/21/15 <br /> A513 DETAILS 12/05/14 1L10-47 PARTIAL LRYOU7 FLOOR PLAN 10/20/15 FS1AG61 BUILDING WORKS PLAN 04/21/15 <br /> A514 DETAILS 07/28/15 1L10-52 PARTIAL LAYOUT FLOOR PLAN 10/20/15 FS1A462 BUILDING WORKS PLAN 04/21/15 <br /> A515 MILLWORK DETAILS 05/19/15 1L10-57 PARTIAL LAYOUT FLOOR PLAN 10/20/15 FS1A463 REFRIG. ROUGH-INS PLAN 04/21/15 <br /> A516 CEILING DETAILS 05/19/15 L10-L59- PARTIAL LAYOUT FLOOR PLANS FS1A464 REFRIG. ROUGH-INS PLAN 04/21/15 <br /> A517 ROLLING HANGAR DOOR 03/q3/15 2L10-12 PARTIAL LAYOUT FLOOR PLAN 12/01/15 FS1A500 NOTES AND DETAILS 04/21/15 <br /> A518 DETAILS 09/08/15 2L10-17 PARTIAL LAYOUT FLOOR PLAN 09/22/15 FS1A501 U71LI7Y SCHEDULE 04121/15 <br /> A519 DETAILS 10/20/15 2L10-22 PARTIAL LAYOUT FLOOR PLAN 10/20/15 FS1A502 UTILITY SCHEDULE 04/21/15 <br /> A520 DETAILS 12/01/15 2L10-27 PARTIAL LAYOUT F�OOR PLAN 10/20/15 FS1A503 REFRIGERATION ENGINEERING 04/21/15 ' <br /> A521 CEILING DETAILS 05/19/15 2L1d-32 PARTIAL LAYOUT FLOOR PLAN 10/20/15 FS1A504 EXHAUST HOOD ENGINEERING 04/21/15 <br /> A522 DETAILS 06/30/15 2L10-37 PARTIAL LAYOUT FLOOR PLAN 10/20/15 FS1A505 EXHAUST HOOD ENGINEERING 04/21/15 <br /> A524 DETAILS 12/22/15 2L10-42 PARTIAL LAYOUT FLOOR PLAN 10/20l15 FS1A506 EXHAUST HOOD ENGINEERING 04/21/15 <br /> A525 DETAILS 12/22/15 2L10-47 PARTIAL LAYOUT FLOOR PLAN 12/01/15 F51A507 EXHAUST HOOD ENGINEERING 04/21/15 <br /> A526 DETAILS 12/01/15 2L10-52 PARTIAL LAYOUT FLOOR PLAN 09/22/15 FS1A508 EXHAUS7 HOOD ENGINEERING 04/21/15 <br /> A600-A620 -TOOLING 2L10-57 PARTIAL LAYOUT FLOOR PLAN 10/20/15 FS1A509 EXHAUST HOOD ENGINEERING 04/21/15 <br /> A600=,1. P2P PAINT OPERATIONS-�COMPOSITE PLENUM LEVE,L 12/22/15 L10-L59- PARTIAL LAYOUT PLANS FS1A510 EXHAUST HOOD ENGINEERING 04/21/15 <br /> A600-1,a P2P RAINT OPERAT(ONS= PLENUM LEVEL BOOTHS 1 12/22/15 3L10-12 PARTIAL LAYOUT FLOOR PLAN 05/19/15 FS1A511 EXHAUST HOOD ENGINEERING 04/21/15 <br /> A600-1,b P2P PAINT OP;ERATIONS- ;PLE,NUM LEUEL BOOTHS;2 1;2/22/15 3L10-17 PARITAL LAYOUT FLOOR PLAN 05/19/15 FS1A512 EXHAUST HOOD ENGINEERING 04/21/15 <br /> A600-2 P2P,PA,INT ORERATIONS-COMP.OSITE,1ST.FLOOR PLAN 1;2/22/15 3L10-22 PARTIAL LAYOU7 FLOOR PLAN 05/19/15 F51A513 EXHAUST HOOD ENGINEERWG 04/21/15 <br /> q600-2,a P2P PAINT OPERATIQNS-,1;ST FLOOR PHASE 1; 12/22/15 3L10-27 PARTIAL LAYOUT FLOOR PLAN 05/19/15 FS1A514 �XHAUST N�OD ENGINEERWG 04/21/15 <br /> A600-2b P2P PAINT OPERATIONS- 1ST�LOOR PHASE 2 12/01/15 3L10-32 PARTIAL LAYOUT FLOOR PLAN 05/19/15 FS1A515 EXHAUST HOOD ENGINEERING 04/21/15 <br /> A600-2c P2P- PAINT OPERATIONS- 1 ST FLOOR,PHASE'1 12/22/15 3L10-47 PARTIAL LAYOUT FLOOR PLAN 05/19/15 FS1A516 WALK-IN COOLEWFREEZER ENGINEERING 04/21/15 <br /> A600-3 P2P PAINT OP.ERATIQNS-,HOUSE;;M.ECH.,,LEVEL 12/22/15 3L10-52 PARTIAL LAYOUT FLOOR PLAN 05/19/15 F51A517 WALK-IN COOLER/FREEZER ENGINEERING 04/21/15 • <br /> A600-3a P2P PAINT OPERATIQNS;HOUSE;MECH LEVE,L•FHASE,1 � 12/22/15 3L10-57 PARTIAL LAYOUT FLOOR PLAN 05/19/15 <br /> A600-3b P2P PAINT OPERATIONS - HOUSE MECH LEVEL PHASE 2 12/01/15 L10-L59- PARTIAL LAYOUT FLOOR PLANS � — ����"7� �������� <br /> A600-4 P2P PAINT OPERATIONS'-'COMPQSITE::CONTROL ROOM LEV�L 12/22/15. M1L10-12 PARTIAL LAYOUT FLOOR PLAN 12/01/15 <br /> A600-4a P2P PAI,NT OPERATIONS- CONTROL RQOM PHASE 1 1;2/22/15 M1 L10-17 PARTIAL LAYOUT FLOOR PLAN 05/19/15 <br /> A600-4b P2P PAINT OPERATIONS - CONTROL ROOM PNASE 2 12i01/15 M1L10-22 PAR7IAL LAYOUT FLOOR PLAN 05/19/15 <br /> A600-5 P2P PAI,NT OP,ERAT(ONS-COMPQSITE"EQU1P.;:LEVEL 12/22/15 M1L1Q-27 P/�RTIAL LAYOUT FLOOR PLAN 12/01/15 <br /> A600-5a P2P PAI,NT,OPERATIQNS- ,EQUIP;LEV,EL PHASE 1 12/22/15 M1L10-32 PARTIAL LAYOUT FLOOR PLAN 12/01/15 <br /> A600-5b P2P PAINT OPERATIONS- EQUIP. LEVEL PHASE 2 '12/01/15 M1L10-37 PARTIAL �AYOUT FLOOR PLAN 10/20/15 <br /> A600-6 P2P PAINT OR.ERATIONS = FURNITURE/;EQUIP.;PLANS 1:2/22l15 M1L10-42 PARTIAL LAYOUT FLOOR PLAN 12/01/15 <br /> A600-7 P2P PAINT OP,ERATIONS-MIXING;ROOM EQUIP. PLAN 12/22l15 M1 L10-47 PARTIAL LAYOUT FLOOR PLAN 12/01/15 <br /> A600-1,0 P2P =PA.INT OPERATIONS-`�LEUATIONS 12/22/15 M1 L10-52 PARITAL LAYOUT FLOOR PLAN 12/01/15 <br /> A600-11 P2P =PAINT OPERATIONS-_;;EL,EVATIONS ��`� 12/22/15 M1L10-57 PARTIAL LAYOUT FLOOR PLAN 05/19/15 <br /> A600-20 P2P- Pl�INT OPERATIONS-SECTIONS 12/22/1;5 AF10-AF59- PARTIAL FINISH FLOOR PLANS <br /> A6:00-21 P2P .PAINT OPERAT.I.ONS,,_:SECTI.ONS 12/22/15 3AF10-12 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> A600-22 P2P,-PAINT.,OPER,ATIONS -;SECTIONS 12/22/15 3AF10-17 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> A600-23 P2P -PAINT OPERATIONS- SECTIONS 12/01/15 3AF10-22 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> A600-40 DOOR:SCHED;ULE 1,2/22/15 3AF10-27 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> A600-6Q ENLARG�D STAIR PLANS 12/22/1.5: 3AF1p-37 PARTIAL FINISH FLOOR PLAN 09/22/15 <br /> A600-6.1 ENLARGED STAIR PCANS 12/22/15 3AF10-47 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> _ _ _ _. <br /> A600-62 STAIR SECTIONS, 1:2f,22/15 3AF10-52 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> /A600-63 STAIR,SECT(ONS 12/22/;15 3AF10-57 PARTIAL FINISH FLOOR PLAN 05/19/15 ' <br /> A600-70 DETAILS P2P;:PAINT;OPERATIONS: ��'�� 12/22/15 AF10-AF59 - PARTIAL FINSIH FLOOR PLANS <br /> ,) 600-71 DETAILS P2P;,PAINT.;QPERATIQNS 12/22/1,5 2AF10-12 PARTIAL FINISH FLOC3R PLAN 09/22/15 . <br /> A600a P2P CODE ANALYSIS-,PLENUM LEVEL 12/22/15 2AF10-17 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> A600b P2P CODE ANALYSIS;- P.AINT BOQTH LEVEL 1;2/22i15 2AF10-22 PARTIAL FINISH FLOOR PLAN 09/22/15 <br /> A6.00c P2P CODE ANAI.YSIS;-CONTR9L;,ROOM,CEV�L 1:2/22/15 2AF10-27 PARTIAL FINISH FLOOR PLAN 09/22/15 <br /> A600d P,2P-CQDE ANP,LYS.IS,- E.QUI,PMENT',PLqTFQRM LEVEL 1.2/22/1;5 2AF10-32 PARTIAL FINISH FLOOR PLAN 09/22/15 <br /> _ _ _ <br /> A600e P2P CODE QNALYSIS PAI.NT BOOTN,CQNTROL AREAS 1;2/22/1;,5 ZAF10-37 PARTIAL FINISH FLOOR PLAN 09/22/15 <br /> A601 FLOOR PLAN -SPAR TRIM AND DRILL 12/07/15 2AF10-42 PARTIAL FINISH FLOOR PLAN 09/22/15 <br /> A601-60 ENLARGED STAIR PLANS -SPAR TRIM & DRILL 11/03/15 2AF10-47 PARTIAL FINISH FLOOR PLAN 08/25/15 <br /> A601-70 SECTIONS - SPAR TRIM & DRILL 11/03/15 2AF10-52 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> A601-71 DETAILS - SPAR TRIM & DRILL 11/03115 2AF10-57 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> A602 FLOOR PLAN - S7RINGER TRIM & DRILL 12J01/15 AF10-AF59 - PAR7IRL FINISH FLOOR PLANS <br /> A602-60 ENLARGED STAIR F'LANS -STRINGER TRIM & DRILL 12/22/15 M1AF10-12 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> A602-70 SECTIONS -STRINGER TRIM &DRILL 12/22/15 M1AF10-17 PAR7IAL FINISH FLOOR PLAN 05/19/15 � <br /> A602-71 DETAILS - STRINGER TRIM &DRILL 12/22/15 M1AF10-22 PARTIAL FINISH FLOOR PLAN 09/22/15 <br /> A603 FLOOR PLAN - PANEL TRIM & DRILL 11/03J15 M1AF10-27 PARTIAL FINISH FLOOR PLAN 10/20/15 <br /> A603-60 ENLARGED STAIR PLANS - PANEL TRIM & DRILL 11/03/15 M1AF10-32 PARTIAL FINISH FLOOR C'LAN 05/19/15 <br /> A603-70 SECTIONS - PANEL TRIM & DRILL 11/Q3/15 M1AF10-37 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> A603-71 DETAIL-PANEL TRIM& DRILL 11/03/15 M1AF10-42 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> A604 FLOOR PLAN -SPAR NDI 12/22/15 M1AF10-47 PARTIRL FINISH FLOOR PLAN 05/19/15 <br /> A604-01 SPAR NDI -OPERATOR BOOTH 12/22/15 M1AF10-52 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> A605 FLOOR PLAN -STRINGER NDI 12/01/15 <br /> A606 FLOOR PLAN - PANEL NDI 10/06/15 <br /> A607-01 COMPOSITE FLOOR PLAN - FREEZER 12/22/15 <br /> A607-02 COMPOSITE FLOOR PLAN - �REEZER RQOF 11/03/15 <br /> A607-20 FREEZER SECTIONS 12/22/15 <br /> A607-21 LOADING DOCK ROOF ACCESS SECTIONS 11/03/15 <br /> A607-40 DOOR SCHEDULE 12/22/15 <br /> A608 FLOOR PLAN -SPAR WASH 12/01/15 <br /> A608-60 SECTIONS -SPAR WASH 12/01/15 <br /> A608-61 SECTIONS-SPAR WASH 12/01/15 <br /> A609 FLOOR PLAN -STRINGER WASH 12/22/15 <br /> A609-60 SECTIONS -STRINGER WASH 12/22/15 <br /> A609-61 SECTIONS -STRWGER WASH 12/01/15 <br /> A609-70 DETAILS -STRINGER WASH 12/01/15 ' <br /> A610 FLOOR PLAN - PANEL NDI/PANEL WASH 12/22/15 <br /> A610-01 PANEL NDI/PANEL WASH -OPERATOR 800TH 12/22/15 <br /> A610-60 SECTIONS -PANEL NDI/PANEL WASH 12/01/15 <br /> A610-61 SECTIONS -PANEL WASH 12l22/15 <br /> A611-01 S2P SPAR OPERATIONS - PLENUM LEVEL 11/17/15 <br /> A611-02 S2P SPAR OPERATIONS- 1 ST FLO�R PLAN 11/17/15 <br /> A611-03 S2P SPAR OPERP,TIONS -CONTROL ROOM LEVEL 11/17/15 <br /> A611-04 S2P SPAR OPERATIONS - EQUIP. PLATFORM LEVEI. 11/17/15 <br /> A611-20 S2P-SECTION 11/17/15 <br /> A611-21 S2P - SECTION 11/17/15 � � <br /> A611-22 S2P - SECTION 11i17/15 <br /> A611-23 SP2 -SECTION 11/17/15 <br /> A611-24 SP2 -SECTION 11/17/15 <br /> 9Q� 5W ��th Str�e� Suite �Q7 <br /> F�entQn, 1�lashin�ton 98057 <br /> � <br /> � <br /> DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE ,dr", <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE � oF Wqsh y ACCEPTABILITY KEB 12I22J15 SF�IEET INDEX W2548317 _ _ 12/22/15 � <br /> >; � / �r THIS DESIGN AND/OR CHECKED <br /> "'�� 5P � SPECIFICATION IS APPROVED GRK 12/22115 SHEET � <br /> '�� ' � BRPHARCHITECTS ENGINEER r�T�E BOEING 777X CWC BUILDING � <br /> r Y�� EN�iNEFRsiNc. APPROVED BY DEPT. DATE GRK 12J22115 ao <br /> ,. <br /> No.s1a� CNECKED �����I�� ��_�� �y <br /> � r <br /> • `�P,���/ P�\= APPROVED JOB NO. COMP NO. �O-5$-GZa Y <br /> c9TF OF AUZNO`��v APPROVED DWG NO. <br /> ARCHITECTURAL MASTER EVERETT, WA 40-58-G2a <br />