Laserfiche WebLink
PACU 40-58 INTERIOR � —D 40-58 EXTERIOR <br /> 1 <br /> AMU SUPPLY FAN, TYP. <br /> A <br /> VOLUME DAMPER (TYP) T <br /> � � <br /> �-- OSA <br /> AIR FILTER <br /> INDIRECT GAS BURNER (2-STAGE) <br /> ISOLATION VALVE DISCHARGE ABOVE <br /> ROOF LEVEL. 3000 ' <br /> FPM <br /> CEILING MOUNTED AT EXIT. • <br /> AIR OUTLETS, 2400 CFM TYP. <br /> SPRAY BOOTH#1 <br /> TO GAS SUPPLY <br /> T <br /> TO AUTOMATION STORAGE <br /> �P EF AMU , <br /> 49 ' <br /> T <br /> 777 WIN� PANEL <br /> DP TO FACTORY FLOOR <br /> T <br /> ABOVE GRADE <br /> FLOOR MOUNTED DIFFERENTIAL PRESSURE BELOW GRADE <br /> EXHAUST GRATE, TYP. SENSOR, TYP. <br /> DP <br /> F-1 <br /> FILTER BANK, TYP. _ <br /> PROCESS FLOW DIAGRAM - PACU-1 , <br /> EF-49 � <br /> NTS M 1 c F-3 <br /> SPRAY BOOTH OPERATIONAL MODES <br /> F-1 DP ' <br /> MODE: MANUAL SPRAY AUTOMATED SPRAY CURE PREP MAINTENANCE MODE �p <br /> TEMPERATURE TEMPERATURE TEMPERATURE TEMPERATURE TEMPERATURE � <br /> EQUIPMENT POSITION SETTING FLOW RATE SETTING FLOW RATE POSITI�N SETTING FLOW RATE SETTING FLOW RATE SETTING FLOW RATE DIFFERENTIAL PRESSURE SENSORS MEASURING <br /> DESCRIPTION <br /> TAG NAME POSITION POSITION POSITION PLENUM LEVEL FILTER PRESSURE DROP ARE <br /> °F CFM °F CFM °F CFM °F CFM °F CFM PHYSICALLY LOCATED AT FACTORY FLOOR LEVEL. TYP. <br /> AIR HANDLING PACU-1 ON 70 82,000 ON 70.0000 82,0�0 ON 140 60,000 ON 70 60,000 ON 70 25,000 <br /> UNIT <br /> EXHAUST FAN EF-49 ON NA 90,200 ON NA 90,200 ON NA 66,000 ON NA 66,000 ON NA 27,500 � <br /> DOORS TO BOOTH - OPEN NA NA LOCKED NA NA LOCKED NA NA OPEN NA NA OPEN NA NA � ' <br /> DOORS TO � <br /> DOGHOUSEFROM - OPEN NA NA OPEN NA NA LOCKED NA NA OPEN NA NA OPEN NA NA <br /> HALLWAY <br /> DOORS AT _ LOCKED NA NA LOCKED NA NA LOCKED NA NA LOCKED NA NA OPEN NA NA <br /> PLENUM LEVEL <br /> 900 SW 16th Street Suite 307 FSi consulting engineers <br /> Renton, Washin�ton 98057 Solutions & Service <br /> � <br /> � <br /> SYM REVISION . BY APPROVED OATE SYM REVISION BY APPROVED DATE DR,4WN DATE SUBTITLE CURRENT REVISION SYMBOL pATE � <br /> �. oAN�, AccEP,-ag���,-Y NJH 12/22l15 PROCESS FLOW DIAGRAM - PACU-1 , EF-49 W2548317 0 12/22/15 <br /> 0 <br /> 0 ISSUED FOR CONSTRUCTION FSi 12/22/15 '� c� wa�,� �� THIS DESIGN AND/OR CHECKED N <br /> � W4'�'��' - '�� �` SPECIFICATIONISAPPROVED RED 12/22115 SHEET �n <br /> �OE,��� � � ENGINEER TITLE BOEING 777X CWC SUILDING � . <br /> p� APPROVED BY DEPT. DATE �SC �2/22/�5 � A � C N <br /> CHECKED <br /> \ / °� <br /> 20290 4 I�I � <br /> BUILDING 40-58 ` <br /> � N <br /> o,���(STE.RE� �e�``' APPROVED r <br /> JOB NO. COMP NO. <br /> FSS�oNAi. wN`' RED 40-058-M1c Z <br /> APPROVED DWG NO. <br /> ��r22i�5 MECHANICAL MASTER EVERETT, WA 40-058-M1c <br />