My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12011 19TH AVE SE 2019-07-25
>
Address Records
>
19TH AVE SE
>
12011
>
12011 19TH AVE SE 2019-07-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 9:21:22 AM
Creation date
7/25/2019 9:21:10 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
12011
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
} <br /> 12011 19th Avenue SE <br /> Everett,WA 98028 <br /> Project Number:2018-0363 <br /> 5.0 FINDINGS <br /> Sample Number Material Description by Layer Location Asbestos Quantity** Friable* <br /> 1:Texture with paint 1:ND <br /> 2018-0363-1-1 Upper level,storage,wall <br /> 2:Drywall 2:ND <br /> 1:Texture with paint 1:ND <br /> 2018-0363-1-2 Upper level,break room,wall <br /> 2: Drywall 2:ND <br /> 1:Texture with paint 1:ND <br /> 2018-0363-1-3 Upper level,office 1,wall <br /> 2:Drywall 2:ND <br /> 1:Texture with paint 1:ND <br /> 2018-0363-1-4 Upper level,foyer,wall 5400 ft2 Yes <br /> 2:Drywall 2:ND <br /> 1:Texture with paint 1:ND <br /> 2018-0363-1-5 2:Texture with paint Upper level,stairway,wall 2:2% <br /> 2:Drywall 3:ND <br /> 2018-0363-1-6 Upper level,kitchen,wall <br /> Not analyzed Not <br /> analyzed <br /> 2018-0363-1-7 Upper level,bathroom 2,wall <br /> 1: Hard mudded elbow 1:ND <br /> 2018-0363-2-1 2:Hard mudded elbow Main floor,garage 2,on the pipes 2:ND <br /> 3:Hard mudded elbow 3:4% <br /> 7 elbows Yes <br /> 2018-0363-2-2 Main floor,garage 2,on the pipes <br /> Not analyzed Not <br /> analyzed <br /> 2018-0363-2-3 Main floor,garage 2,on the pipes <br /> 1:Joint compound with paint 1:ND <br /> 2018-0363-3-1 2:Joint compound with paper Main floor,furnace room,wall joint 2: ND <br /> 2: Drywall 3:ND <br /> 2018-0363-3-2 Drywall with paint Main floor,office 3,mid-wall ND <br /> 1:Beige vinyl cove base 1:ND <br /> 2018-0363-3-3 Upper level,storage,wall base <br /> 2:White mastic 2:ND <br /> 1:Red carpet 1:ND <br /> 2018-0363-3-4 2:Red vinyl floor tiles Upper level,storage,floor 2:ND 100 ft2 No <br /> 3:Black mastic 3:3% <br /> ND None Detected <br /> The friability of this material was determined at the time of this inspection. Subsequent activities such as demolition, <br /> renovation,or abatement may affect the friability of this material. <br /> These quantities are only an estimate of the asbestos containing material discovered on site. Accuracy of these <br /> estimates must be verified by the asbestos abatement contractor on site. <br /> NVL Laboratories, Inc. <br /> 4708 Aurora Ave N <br /> Seattle,WA 98199 <br /> Phone(206)547-0100•Fax(206)634-1936 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.