My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2902 RUCKER AVE GOLDS GYM 2018-01-01 MF Import
>
Address Records
>
RUCKER AVE
>
2902
>
GOLDS GYM
>
2902 RUCKER AVE GOLDS GYM 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2019 10:33:29 AM
Creation date
7/31/2019 10:33:19 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
2902
Tenant Name
GOLDS GYM
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> f�/�/� /�/��/�S <br /> ENQINEERING /PU6LIC SERVICES DEPI�RTMEMT <br /> Ma�h 13, 2002 <br /> Dick Wacker <br /> 2802 Wetmore Avenue <br /> Everett,WA 98201 <br /> RE: Owner: Wacker <br /> Job Address: 2902 Rucker Avenue <br /> Plan Check No: M0203-012 <br /> De:�r Mr. Wacker: <br /> In response to your application for a construction pertnit, your plans have been examined and you are <br /> advised that the issuance of a pertnit is being withheld for the reasons listed below. These comments <br /> address building issues only. Additional revisions, or additions, may tx rcquired by other <br /> departments (such as Utilities, Planning or Fire). All references refer to the 1997 Unifortn Building <br /> Code, as amended by the State of Washington and/or Washington State Energy Code, 2001 Edition. <br /> unless stated otherwise. <br /> In order [or the processing of your application to continue, it will be neccssary to provide the <br /> Building Division with two complete new sets of drawings retlecting the rnrrections requested. <br /> l. Please provide verification for the capability of the roof to support the proposed units along <br /> with the existing snow (25 ps� and dead load requirements. <br /> Upon nesubmittal of the drawings, your application will be given priority and plan review will <br /> recommence. <br /> All required submittals shall be of sufficient detail and contain sufficient information to ensure that <br /> the proposed structure will be constructed in compliance with all adopted codes. <br /> Sincerely, /y� ��'� <br /> ���Y� <br /> Steve Miller <br /> Associate Engineer <br /> ��t�"`�""����Et.v�'+�1'�"'3�bb"°Ce`�ar§treet • Everett.wA sezot • (a25)25�-s2oo • Fax(425)257-8856 <br />
The URL can be used to link to this page
Your browser does not support the video tag.